My WebLink
|
Help
|
About
|
Sign Out
5
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2020
>
11-18
>
5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 4:21:38 PM
Creation date
11/12/2020 4:18:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/18/2020
DESTRUCT DATE
15Y
Document Relationships
5_Exhibit A
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2020\11-18
5_Exhibit B - Plans
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2020\11-18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
center parking lot which would be resurfaced/restriped and include upgraded lighting, <br /> landscaping and new sidewalk access. Phase I would also include construction of a new plaza <br /> at the northeast portion of the subject site with pedestrian circulation connecting the proposed <br /> campus to Stoneridge Mall, BART, and adjacent office and residential developments, although <br /> this phase would be designed to facilitate pedestrian connections to internal open spaces (e.g. <br /> a central campus courtyard with outdoor collaboration spaces for employees) and buildings <br /> developed in future phases of the project. The balance of the subject site would remain vacant <br /> under Phase I and be fenced and planted with native grasses. See Figure 3 below for <br /> additional detail. <br /> Subsequent phases, whose timing is to be determined based on the business needs of 10X <br /> Genomics, but is expected to be complete by 2030, would include construction of up to an <br /> additional 281,000 square feet of building area within one or two additional buildings generally <br /> along the east side of the subject site. Exhibit B shows these buildings in approximate <br /> locations, setback between 50 to 100 feet or more from all subject site frontages; however, <br /> Exhibit B also shows a 32-foot minimum setback line meaning these future buildings may be <br /> shifted anywhere within that minimum setback line as the applicant refines subsequent phases <br /> of their master plan. The applicant proposes the maximum height of these later phase <br /> buildings would be up to 92 feet (108 feet with rooftop equipment screen) (including rooftop <br /> enclosures for mechanical equipment, etc.), although it is likely these future buildings may <br /> ultimately be less than 92 feet (e.g. two shorter, but larger footprint buildings compared to what <br /> is shown in Exhibit B). <br /> The later phases also include construction of an (up to) approximately 60-foot-tall parking <br /> structure, providing 1,180 parking spaces, in six levels (five stories, plus rooftop parking) along <br /> the west side of the subject site. Recorded agreements between the owners of the adjacent <br /> Stoneridge Mall, and this property, require minimum parking ratios of four spaces per 1 ,000 <br /> square feet to be provided on the subject property; this ratio would be met by the proposed <br /> 1,180 parking spaces. <br /> However, the ratio required by the agreements is relatively high compared to the PMC's typical <br /> ratios for uses similar to those proposed, and could potentially result in the project being <br /> "overparked" based on the project's anticipated employee density and the ultimate mix of land <br /> uses at full campus master plan buildout. Since these existing agreements expire in 2028, and <br /> it is likely the full campus master plan wouldn't be constructed until after this date, the applicant <br /> proposes an overall parking ratio of 3.3 spaces per 1,000 square feet for the entire campus <br /> master plan development at buildout. This lower parking ratio may allow for the total number of <br /> parking spaces, and size of the parking structure, to be reduced. <br /> The proposed project would continue to utilize all existing driveways described above, with the <br /> majority of vehicular access focused on Springdale Avenue, which would provide the main <br /> ingress and egress from parking areas. Building 1 would have entry and drop-off access from <br /> the existing driveway off Stoneridge Mall Road (ring road). Building l's service entry would be <br /> screened and integrated into the building design with access from the existing driveway off <br /> Springdale Avenue. Buildings 2 and 3 would also have an entry and drop-off point access from <br /> the existing driveway off Stoneridge Mall Road at the existing McWilliams Lane signal <br /> intersection. <br /> PUD-139 and P20-0973, 10X Genomics, Inc. Planning Commission <br /> 5of12 <br />