Laserfiche WebLink
Buildings 2 and 3 would have a single service entry that would be screened and integrated into <br /> the building design with access from the existing driveway off Springdale Avenue. All parking <br /> (Phase 1 surface parking, and Phase 2/3 structured parking) would be situated along the west <br /> side of the subject site and be accessed from the existing driveway off Springdale Avenue. <br /> Figure 3: Phase I (Building 1) Site Plan <br /> -i>--- <br /> 1 /// to 1 <br /> '3 / h,1.iM1l' <br /> ti4 <br /> t <br /> bW <br /> ' .' .i ✓}, \tt <br /> K' .: <br /> ` <br /> � 1 <br /> ii;‘, ...,. <br /> It t <br /> rsosio, <br /> OiEP EiEU L....',A-NE 6TE FLIM-ELILDN111 <br /> PUD-139 and P20-0973, 10X Genomics, Inc. Planning Commission <br /> 6 of 12 <br />tes Page 7 of 7 October 28, 2020 <br />Agenda Page 3 of 3 November 18, 2020 <br />