Laserfiche WebLink
Commissioner Allen expressed support for the project but reiterated her concern about the <br /> band of orange around the building. She inquired whether the item could be divided into two <br /> different votes. Assistant City Attorney Julie Harryman clarified this was not possible, but that <br /> Commissioner Allen's comments and concerns could be reflected in the record. Commissioner <br /> Allen stated she had never voted against a project due to color, but she remained concerned <br /> due to the potential of setting a precedent. <br /> Commissioner Balch pointed out the white cap across the orange band on the top of the <br /> one-story buildings on Page 8 of the submitted plans and suggested adding the same to the <br /> top of the second story building. Commissioner Allen stated she understood the tradeoff but <br /> discussed the visual impact on the future bicycle and pedestrian trail on Nevada Street. <br /> Commissioner Brown asked if there was any orange visible from residential areas. <br /> Commissioner Balch clarified there was some orange visible from the Irby Ranch <br /> development, though Chair Ritter pointed out the existing storage buildings in between Irby <br /> Ranch and the three-story building provided a buffer. Commissioner Brown also noted that the <br /> existing storage buildings' doors are painted orange. <br /> Commissioner Balch moved to approve Cases P19-0128 and P19-0129 subject to the <br /> revised draft Conditions of Approval, Exhibit A as modifications were provided in a staff <br /> memorandum, with an additional modification to conditions as referenced by the <br /> applicant regarding Condition 52. <br /> Commissioner Pace seconded the motion. <br /> Mr. Miranda stated he had been working with Commissioner Allen and staff in an effort to <br /> remove as much corporate branding as possible. He confirmed they would reluctantly remove <br /> the orange on the third story, although he was originally under the impression that leaving it on <br /> the office was acceptable as Stanley Boulevard was more of a commercial street. He <br /> apologized for any misconception when discussing the colors with Commissioner Allen. He <br /> stated there were exceptions to everything, including the orange on the building, but clarified <br /> many of the examples Commissioner Allen provided without orange on the buildings were <br /> 20 years old and had since been updated and remodeled to include the orange. He discussed <br /> the need to utilize the corporate colors and reminded the Commission of the massive <br /> improvement from the existing condition. <br /> Commissioner Balch asked if the renderings on Page 8 of the submitted plans were accurate <br /> or if the applicant was willing to modify them to remove the orange band. Mr. Miranda stated <br /> they were willing to remove the orange band on the three story building. <br /> Commissioner Balch withdrew his motion. Commissioner Pace withdrew his second. <br /> Commissioner Allen asked if the applicant was willing to remove the orange band from the <br /> single-story portion of the building. Mr. Miranda requested it remain. Commissioner Allen <br /> confirmed the Commission agreed the orange band could remain on the sales office and single <br /> stories. <br /> Commissioner Balch stated it was a significant compromise and agreed with keeping the <br /> orange band on the single-story buildings and the office as presented in the submitted plans. <br /> Planning Commission Minutes Page 4 of 7 October 28, 2020 <br />