My WebLink
|
Help
|
About
|
Sign Out
ORD 2210
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:55 PM
Creation date
10/15/2020 1:20:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/15/2020
DESTRUCT DATE
PERMANENT
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and approval of the Director of Engineering/City Engineer and prior to City Council <br /> acceptance of public improvements. <br /> 70. PRIVATE EASEMENTS: The applicant shall record private access, drainage, and utility <br /> easements across the project for the benefit of the individual lots as determined by, <br /> subject to the review and approval by, and at a time determined by the Director of <br /> Engineering/City Engineer. <br /> 71. UTILITY VAULTS: The applicant shall set existing and proposed utility vaults to the <br /> grade of adjacent curb and/or sidewalk as determined by and subject to the review and <br /> approval of the Director of Engineering/City Engineer and prior to City Council <br /> acceptance of public improvements. <br /> 72. CREEK EASEMENT DEDICATION: The applicant shall dedicate a 60-foot public storm <br /> drain easement located on Lot 5 to the City of Pleasanton on the Final Map. The <br /> property owner(s) of Lot 5 shall be responsible for maintenance of the creek. If the <br /> property owner(s) of Lot 5 fails to maintain creek to the satisfaction of the City Engineer. <br /> the City has the right to enter and maintain at the cost of the property owner(s) of Lot 5. <br /> (PROJECT SPECIFIC CONDITION) <br /> Subdivisions <br /> 73. MAINTENANCE OF PRIVATE IMPROVEMENTS: All private improvements including <br /> but not limited to storm drainage swales, gutters, inlets, outfalls, channels, retaining <br /> walls, fences, etc., shall be privately maintained by the property owners. (Project <br /> Specific Condition) <br /> 74. OUTSIDE AGENCY COMPLIANCE: The applicant shall comply with all applicable <br /> conditions of outside agencies having jurisdiction prior to the approval of the final map. <br /> 75. FINAL MAP APPROVAL: The applicant shall submit to the Engineering Department one <br /> completely signed Mylar copy of the final map, one signed copy of the improvement <br /> plans, one signed copy of the Subdivision Agreement, one signed copy of the Creek <br /> Maintenance Agreement, one signed copy of the Public Trail Maintenance Agreement. <br /> one signed copy of the Stormwater Operations and Maintenance Agreement, and one <br /> signed copy of the Creek Maintenance Agreement prior to the City Council approval of <br /> the final map. If existing buildings or structures on-site are to be demolished or retained, <br /> or existing utilities to be relocated, the applicant shall obtain the necessary permits from <br /> the Building and Safety Division and complete all work prior to recordation of the final <br /> map. <br /> 76. STREET DEDICATIONS AND GRANTS OF EASEMENTS: All dedications, open offers <br /> of dedication, or grants of easements to the City shall be dedicated on the face of the <br /> final map unless otherwise approved by the Director of Engineering/City Engineer. <br /> Agreements and Covenants <br /> 77. SUBDIVISION AGREEMENT: The applicant shall enter into a subdivision agreement <br /> with the City agreeing to construct and complete all improvements necessary to serve <br /> the subdivision. The agreement shall be executed and submitted to the City prior to <br /> PUD-135 City Council <br /> Page 13 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.