water line relocation was called out on the utility plan. At 95%, the water line replacement was fully <br />detailed. Format changes to the water line relocation plan was requested, incorporated and <br />resubmitted after the 95% submittal for the City's use. <br />Changes to Potholing Scope - Potholing was completed in advance of the 65% submittal by Quincy <br />subconsultant Bess Test Labs. The originally allocated budget for potholing was not sufficient to <br />include the unanticipated night work only provision or the additional potholes needed for the 12" <br />water line south of the Hopyard/Owens intersection - which was previously not within the project <br />excavation limits. <br />Raised Separated Bike Lane - One City comment on the 65% submittal requested the bike lane be <br />raised and placed behind the curb and required a significant design change. The curb location shifted <br />east and the curb profile had to be redesigned. The protected intersection and westerly curb ramps <br />had to be revised as well to accommodate the transition of the raised bike lane to an at -grade crossing <br />at the intersection via bike ramps at both ends of the raised bike lane. <br />Left Turn Lane Widths - Caltrans provided comments on the 95% design and Design Standard Decision <br />Document stating that the proposed 10' left turn lanes would not be acceptable. In coordination with <br />the City, it was decided to narrow the median by 05, narrow the northbound bike lane buffer by 0.5' <br />and narrow the southbound separated bike lane by 1' in order to increase the left turn lane widths to <br />11'. Quincy prepared draft plans with these revisions, including the curb profiles, pavement <br />delineation and stage construction. We also resubmitted the DSDD to Caltrans for approval after <br />incorporating their comments. <br />Out of Scope Work to be Done <br />Some of the following additional work items were mentioned above have been initiated, but they have <br />not been completed. These items plus some additional out of scope items are described below. <br />Curb Ramp and Driveway Reconstruction - City comments on the 95% submittal that would be <br />considered additional scope items are replacement of the curb ramp at the northeast quadrant of the <br />intersection and replacement of the driveway approach in the southeast quadrant that would be <br />disturbed by the water line replacement. Though the City will advance the water line replacement with <br />another contract, Quincy assumes that the City will still want the project to reconstruct the driveway <br />with an ADA path of travel. Quincy will also maintain the assumption from the original task order that <br />the City will not nee Quincy's assistance to obtain any TCEs for this project. <br />Bike Lane Buffer Changes - Caltrans' comments on the latest DSDD submittal are to provide a <br />minimum 2' bike lane buffer for the northbound bike lane and 1.5' buffer for the southbound <br />separated bike lane. This will require modification of the in -progress plans. <br />Supplemental Survey - Additional survey will be required to design the curb ramp at the northeast <br />quadrant and driveway at the southwest quadrant and design the profile of the median curb <br />realignment north of the eastbound off -ramp intersection. <br />