My WebLink
|
Help
|
About
|
Sign Out
10 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
090120
>
10 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2020 4:42:49 PM
Creation date
8/27/2020 9:20:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/2/2020
Document Relationships
10
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2020\090120
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. DARREN BAUNE, P.E. <br />JULY 22, 2020 <br />PAGE 2 <br />Well 8 - The City operates Well 8 at a reduced capacity of 2,200 gpm because the well has historically <br />had problems with sanding. The original design capacity of Well 8 is 3,650 gpm. The City prefers to <br />evaluate alternatives to remove sand, or modify the well operations, to return Well 8 to its design <br />capacity of 3,650 gpm. Based on the results of the evaluation, the City will determine whether to design <br />Well 8 and related PFAS treatment for the original design capacity or the reduced capacity it currently <br />operates at. The City also performed a video inspection of the Well 8 casing in 2013. It is assumed this <br />video is available for Carollo's review. <br />SCOPE OF WORK <br />LSCE was asked to prepare a scope and budget based on previous correspondence regarding the project <br />LSCE's Scope of Work is outlined below: <br />Task 1— Well 5 Support Services <br />• Historical data compilation and review <br />• Review Well 5 video <br />• Provide Letter Report summarizing well video analysis and provide recommendations <br />Task 2 — Well 6 Support Services <br />• Historical data compilation and review <br />• Oversee video of Well 6. <br />o This task assumes a static and dynamic test will be performed and it is not required <br />to remove the pump. <br />o LSCE to sub -contract well video contractor <br />• Water quality sampling (TDS, Sand, Turbidity and Bacteria) <br />o LSCE contract directly with analytical lab <br />• Provide letter report summarizing well video analysis and provide recommendations <br />Task 3 — Well 8 Support Services <br />• Historical data compilation and review <br />• Review 2013 Well video <br />• Oversee Well 8 video <br />o This task assumes a static and dynamic test will be performed and it is not required <br />to remove the pump <br />o LSCE to sub -contract well video contractor <br />• Water quality sampling (TDS, Sand, Turbidity and Bacteria) <br />o LSCE contract directly with analytical lab <br />• Provide letter report summarizing well video analysis and provide recommendations <br />Task 4 — Technical Workshop <br />• Prepare materials for workshop <br />• Attend half-day workshop <br />4 LSCE <br />
The URL can be used to link to this page
Your browser does not support the video tag.