Laserfiche WebLink
Task 4.0 - Assumptions <br />1. Topographic survey, geotechnical investigations, potholing and other field investigations are not <br />included in this scope of work. <br />2. The CEQA documentation is not included in this scope of work. <br />3. City will review all major deliverables within 3 weeks of CONSULTANT submitting the Draft <br />deliverable. <br />4. Final design is not included in this scope of work. <br />5. The CONSULTANT will develop 10% level drawings in AutoCAD of the Well 5, 6, and 8 PFAS <br />Treatment and Rehabilitation Project. <br />6. Meetings and workshops will be conducted virtually during the course of the Project under this task. <br />Task 5.0 — PFAS Process Design Confirmation Testing <br />This task will include bench -scale testing with City groundwater to provide the data to more accurately <br />estimate site-specific media replacement frequency, refine O&M and life cycle cost estimates, and could be <br />used as a basis to pre-screen the effectiveness of tested media. This task will be performed in parallel with the <br />other tasks listed above. CONSULTANT shall perform a total of five (5) Rapid Small Scale Column Tests <br />(RSSCT) using GAC and/or IX media using raw water from a single well. In addition to source water <br />characterization, up to five (5) effluent PFAS samples (EPA 537.1) will be collected from each column to <br />characterize breakthrough of these compounds. It is assumed that all columns will be run utilizing the same <br />batch of water supplied by the City. <br />Task 5.0 - Deliverables <br />1. Bench scale testing results. <br />Task 5.0 - Assumptions: <br />1. The testing will be performed at the bench scale. This task does not include full scale pilot testing. <br />Project Schedule <br />The project schedule is summarized in Attachment 2 to Exhibit A. <br />Project Budget <br />The project budget is summarized in Exhibit B. <br />pw://Carollo/Documents/Client/CA/Pleasanton/_Proposals/Well 5, 6 and 8 PFAS Treatment and Well Improvements BODR/Exhibit A_Well S, 6 and 8 PFAS Treatment and Rehabilitation Scope.docx <br />PAGE 10 of 10 <br />