with local funds. Also, the cost of the water pipeline work does not qualify as local <br /> matching funds relative to the federal grant. <br /> Schedule <br /> The proposed work at each bridge is anticipated to be completed within several weeks <br /> after the start of construction, with the exception of work at the Santa Rita Road Bridge <br /> at Arroyo Mocho. The installation of the approach slab at this location will be phased to <br /> maintain two lanes of traffic in each direction across the bridge, which will require an <br /> anticipated 4 months to complete the work at this location. <br /> The anticipated schedule for the project is as follows: <br /> Approval of Plans and Specifications and Award of Contract: June 16, 2020 <br /> Start of Construction: July 2020 <br /> End of Construction: December 2020 <br /> Submitted by: Fisc I Review: Approved by: <br /> 14/ <br /> Stephen Kirk trick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. TRC Engineers Proposal <br /> 2. BCA Proposal <br /> 3. Funding and Estimated Expenditure Summary <br /> 4. Map of Bridges <br /> 5. Bid Summary <br /> Page 5 of 5 <br />