My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
061620
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2020 10:46:11 AM
Creation date
6/11/2020 10:46:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNOL BOULEVARD/I-680 IMPROVEMENTS <br /> PA&F,D <br /> • Alternative evaluation matrix and evaluation process <br /> After reaching a common understanding with Caltrans, CONSULTANT will document <br /> the project's scope and will link it to the CPM schedule that accounts for all activities and <br /> reviews needed to deliver PA&ED. <br /> A narrative summarizing the PSR-PDS alternatives evaluation and agreements with <br /> Caltrans along with any revisions to the scope of work and CPM schedule will be <br /> submitted to CITY for review. All comments will be addressed,and fmal documents <br /> distributed to the PDT. <br /> Subtask 3.3 Mapping <br /> CONSULTANT has base mapping within the Caltrans Right of Way in the vicinity of the <br /> project area and proposes to use the existing mapping for PA&ED work. <br /> CONSULTANT will include right-of-way lines, existing horizontal control, utility, and <br /> drainage facilities on the base mapping using available record data. <br /> Subtask 3.4 Update Viable Alternative. <br /> In parallel with traffic forecast and operations analysis, CONSULTANT will refine the <br /> selected build alternative in the PSR-PDS. Under this task the build alternative will be <br /> refined to determine viable project components. This phase of the design is the most <br /> critical phase as it establishes the major features of the project and the development of <br /> engineering reports and criteria for final design. Preliminary engineering will establish <br /> right-of-way needs, confirm alignment and geometries (which may produce different <br /> environmental impacts to the project) and develop a utility envelope. <br /> Subtask 3.5 Nonstandard Geometric Features. <br /> The geometries of the existing facility and proposed alternatives will be checked for non- <br /> standard features. Geometric refinements will be investigated to assess if any non- <br /> standard features can be eliminated. A list of Boldface and Underline design standard <br /> exceptions will be identified and coordinated with the Caltrans HQ geometrician and <br /> District 4 staff. Once preliminary concurrence on the project geometrics is reached, <br /> Design Standard Decision Document will be drafted and submitted to the Caltrans HQ <br /> geometrician and District 4 staff for review and comment. CONSULTANT will address <br /> comments and submit final Design Standard Decision Document for Caltrans approval <br /> prior to submittal of the Draft Project Report. Traffic and accident analysis,physical <br /> constraints, cost, access control,and environmental impacts will be critical factors in <br /> justifying the design. <br /> Subtask 3.6 Preliminary Engineering Drawings. <br /> CONSULTANT will expand and develop the build alternative and provide layout sheets, <br /> typical sections, R/W lines and requirements, striping plans,retaining wall layouts, <br /> April 10,2020 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.