My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
051920
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 3:23:43 PM
Creation date
5/14/2020 3:23:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/19/2020
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON Propose' <br /> SOLUTION(' <br /> approval prior to the development of the Administrative Draft Initial Study/Consistency Checklist. It is <br /> assumed that the City will provide one set of consolidated, vetted comments (with tracked changes in <br /> the Word document) on the approved draft Project Description to FCS within 2 weeks of submittal. <br /> Changes to the Project Description made after the City has issued their approval may require a Change <br /> Order and may extend the project schedule. <br /> Deliverable <br /> One electronic copy of the draft Project Description in PDF and MS Word format to the City <br /> Task 2: Technical Analyses <br /> In addition to the HVSP EIR,the following technical analysis and reports were completed over the past 5 <br /> years in support of the 2018 Draft SEIR: <br /> • Aesthetics <br /> - Visual Simulations from five key viewpoints <br /> Air Quality and Greenhouse Gas Emissions Analysis <br /> - California Emissions Estimator Model (CaIEEMod)outputs prepared by FCS in Spring 2018 <br /> • Biological Resources Analysis <br /> - United States Fish and Wildlife Database Search completed by FCS in February 2018 <br /> - Biotic Evaluation prepared by Live Oak Associates Inc in June 2017 <br /> - Special Status Plant Survey prepared by Live Oak Associates in June 2018 <br /> • Cultural Resources Analysis <br /> - Phase I Cultural and Paleontological Resources Assessment prepared by FCS in April 2018 <br /> • Geology and Soils <br /> - Geotechnical Feasibility Report prepared by Engeo in January 2015 <br /> - Appropriateness of Geotechnical Feasibility Report prepared by Engeo in June 2018 <br /> • Hazards and Hazardous Materials <br /> - Phase I Environmental Site Assessment prepared by Engeo in January 2015 <br /> • Noise <br /> - Noise measurements completed by FCS in February 2018 <br /> - Traffic noise modeling completed by FCS in February 2018 <br /> • Transportation <br /> - Transportation Assessment completed by Fehr& Peers in June 2018 <br /> z Utilities and Service Systems <br /> - Happy Valley Water&Sewer Technical Memorandum completed by RMC Water and <br /> Environment in November 2016 <br /> FCS also completed a cultural and biological site survey, in 2019,to evaluate potential impacts related to <br /> the construction of the Alisal Trail.The Alisal Trail has not been implemented since the adoption of the <br /> HVSP and a revised alignment,through the Spotorno property, is now proposed as part of the proposed <br /> project. <br /> NORTH AMERICA I EUROPE 1 AFRICA I AUSTRALIA I ASIA 5 <br /> FIRSTCARBONSOLUTIONS.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.