Laserfiche WebLink
In total, the existing and proposed uses would require 372 spaces and the 415 existing parking <br /> spaces on this site would accommodate the parking demand. However, should parking <br /> problems occur, staff has included a condition of approval which allows the Director of <br /> Community Development to refer the use permit back to the Planning Commission for possible <br /> mitigation measures (Exhibit A). Possible mitigating conditions could include reducing the <br /> number of students, modifying the arrival and departure times, etc. <br /> Traffic and Circulation <br /> The Traffic Engineering Division has reviewed the project narrative and plan and determined <br /> the proposed trade school would not have significant impacts on the existing traffic levels, <br /> circulation, and parking. Therefore, a traffic or parking study was not required for this project. <br /> However, the applicant would be required to pay the City Traffic Impact Fee for converting a <br /> portion of the existing office space to a trade school. If unanticipated impacts are observed, <br /> then the application may be brought back to the Planning Commission to impose mitigation <br /> measures. <br /> ALTERNATIVES <br /> As outlined in the above, staff believes the use, as proposed and conditioned, would be <br /> compatible with the surrounding businesses and would not detrimentally affect the surrounding <br /> uses or properties and recommends the Planning Commission approve the project. However, <br /> alternatives to the proposal that could be considered by the Planning Commission include: <br /> 1. Denial of the application. Such an action would preclude the applicant from operating <br /> the trade school portion of the operation; or <br /> 2. Approval of the application with modifications. The Planning Commission could approve <br /> the CUP for the trade school, but with a modified number of students, hours of <br /> operation, or with other changes to the proposal. <br /> Staff believes the proposed trade school will not adversely impact the adjacent uses and the <br /> findings to approve the project could be made as proposed and conditioned. Therefore, staff <br /> recommends neither of the two project alternatives above be pursued. <br /> SUMMARY OF PROS/CONS OF PROJECT <br /> PROS CONS <br /> Occupies an existing vacant floor, and hence, The proposal may increase traffic and <br /> promotes Economic Development parking demand; however, <br /> traffic/circulation and parking impacts <br /> would not be adverse. <br /> Provides opportunities for educational and <br /> professional development <br /> Use is consistent with the zoning designation <br /> HACIENDA OWNERS ASSOCIATION <br /> The Hacienda Owners Association has reviewed the application and found it is in substantial <br /> compliance with Hacienda's guidelines set forth in the CC&R's (Covenants, Conditions and <br /> P20-0350, 5860 Owens Drive, 3rd Floor Planning Commission <br /> 8 of 9 <br />school requires 45 parking spaces for <br /> its 90 adult students, and 13 spaces for its 13 teachers/administrative staff members, a total of <br /> 58 parking spaces. This assumes that all five classrooms and the computer lab are occupied <br /> simultaneously with 15 students in each. However, in reality this would not occur due to <br /> staggering of the classes. The office spaces on the third floor for Administrative & Fiscal <br /> Agency, Apprenticeship, Contract Education, Title IV Childcare and Tri-Valley Career Center <br /> require 45 spaces (13,513 square feet/300 gross square feet). A total of 103 spaces will be <br /> required for the third floor, which includes 58 spaces for the trade school and 45 spaces for the <br /> office space. The medical office on the first-and-second floors requires 195 spaces <br /> (48,800 square feet/250 gross square feet) and the office on the fourth floor requires <br /> 74 spaces (22,320 square feet/300 gross square feet). <br /> P20-0350, 5860 Owens Drive, 3rd Floor Planning Commission <br /> 7 of 9 <br />