My WebLink
|
Help
|
About
|
Sign Out
RES 201131
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES 201131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:46:16 AM
Creation date
2/7/2020 11:45:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
PERMANENT
NOTES
JDEDZ RFSEIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
impact would not be reduced to a less than significant level because the <br /> improvement described in part 4 of Mitigation Measure 4.d-l d is within <br /> Caltrans right-of-way and requires substantial Caltrans design review and <br /> oversight, and is not under the control of the City. Therefore, because the <br /> timing of Mitigation Measure 4.d-1 d is not certain at this time,the <br /> measure is not legally feasible,though the measure is physically feasible. <br /> Mitigation Measures M-TR-1,4.D-la,4.D-lb, 4.D-lc, and 4.D-ld are all <br /> required to mitigate associated impacts(i.e., all of these measures must be <br /> implemented to reduce the impact to Stoneridge Drive [queue spillback] to <br /> less than significant). These mitigation measures are hereby incorporated <br /> by reference and described above under Impact 4.D-1. <br /> (Draft SEIR, pp. 4.D-44 to 4.D-50.) <br /> Impact 4.D-5 <br /> Development facilitated by the Project would affect levels of service for freeway ramps <br /> at merge/diverge areas within I-680 under Existing plus Project conditions. <br /> The Revised Final SEIR evaluates the impact of the Project related to levels of service for <br /> freeway ramps at merge/diverge areas within I-680. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Significant and Unavoidable <br /> Finding: Changes have been incorporated into the Project that would substantially <br /> lessen this impact,however, the changes would not reduce this impact to a less <br /> than significant level. Mitigation Measure 4.D-2 is incorporated into the Project. <br /> Facts in Support of Finding: The following facts and mitigation measure indicate <br /> that the impact will not be reduced to less than significant. <br /> 1. The addition of traffic that would be generated by the Project under Phase <br /> I and full buildout would further degrade operations of already deficient <br /> freeway segments and would either result in or worsen LOS F conditions <br /> at the I-680 northbound and southbound ramp merge/diverge areas at <br /> Stoneridge Drive. <br /> 2. Implementation of Mitigation Measure 4.D-2 set forth in Table 5-1 of the <br /> Final SEIR and listed in the RMMRP will reduce the severity of Impact <br /> 4.D-5; as discussed in the Final SEIR, even with implementation of this <br /> mitigation measure,this impact would not be reduced to a less-than- <br /> significant level because the improvement described in Mitigation <br /> Measure 4.D-2 is within Caltrans right- of-way and requires substantial <br /> Caltrans design review and oversight, and is not under the control of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.