My WebLink
|
Help
|
About
|
Sign Out
RES 201131
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES 201131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:46:16 AM
Creation date
2/7/2020 11:45:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
PERMANENT
NOTES
JDEDZ RFSEIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be approved by the City prior to the issuance of the first building permit for <br /> a Phase I use that would generate 100 or more PM peak-hour trips. <br /> Site(s)affected: All sites within the proposed Zone (Phase I and Full Buildout). <br /> Mitigation Measure 4.d-lc: Johnson Drive at Stoneridge Drive Intersection. <br /> Implement the following improvements: <br /> 1. Construct a third eastbound left-turn lane from Stoneridge Drive to <br /> Johnson Drive in conjunction with an additional northbound receiving <br /> lane on Johnson Drive (north side of intersection). <br /> 2. Construct an additional southbound right-turn lane on Johnson Drive. <br /> 3. Rebuild Johnson Drive as a six lane facility with three or four southbound <br /> lanes and three northbound receiving lanes for a minimum of 700 feet <br /> north of Stoneridge Drive. This improvement would require widening of <br /> Johnson Drive north of Stoneridge Drive by up to 36 feet and widening of <br /> Johnson Drive south of Stoneridge Drive a commensurate amount to align <br /> travel movements through the intersection. <br /> A funding mechanism for these improvements shall be approved by the City prior <br /> to the issuance of the first building permit for a Phase I use that would generate <br /> 100 or more peak-hour trips. <br /> Site(s) affected: All sites within the proposed Zone (Full Buildout not including <br /> Phase I). <br /> Mitigation Measure 4.d-1 d: Stoneridge Drive Queue Spillback(Stoneridge Drive <br /> and Johnson Drive Improvements). Implement the following improvements: <br /> 1. Modify the Stoneridge Drive at Northbound I-680 off-ramp to provide a <br /> northbound right-turn overlap phase. <br /> 2. Construct a second southbound left-turn lane from Johnson Drive to <br /> Stoneridge Drive. <br /> 3. Extend the existing westbound right-tum pocket at the Johnson Drive and <br /> Stoneridge Drive intersection approximately 800 feet east by widening <br /> Stoneridge Drive and convert the resulting lane into a through-right-shared <br /> lane. Install lane markings in the curb lane and adjacent lane indicating I- <br /> 680 Northbound Only to reduce lane changes between Johnson Drive and <br /> the northbound on-ramp. <br /> 4. Construct a second on-ramp lane to northbound I-680 from the westbound <br /> Stoneridge Drive approach. The two lane on-ramp should be merged to <br />
The URL can be used to link to this page
Your browser does not support the video tag.