My WebLink
|
Help
|
About
|
Sign Out
RES 201131
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES 201131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:46:16 AM
Creation date
2/7/2020 11:45:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
PERMANENT
NOTES
JDEDZ RFSEIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 (continued) <br /> SUMMARY OF POTENTIALLY SIGNIFICANT TRANSPORTATION AND TRAFFIC IMPACTS <br /> Mitigation Level of Impact <br /> Impact Location Affected Measure Physical Improvement or Other Mitigation After Mitigation <br /> except M-TR-1— <br /> from developer(s) <br /> Johnson Drive and Park and Ride Lot Intersection.The Significant and <br /> addition of vehicle trips generated by Phase I of the EDZ and M TR 1 Implement TDM Program g <br /> Unavoidable <br /> other near-term projects during the PM peak hour would worsen <br /> the side street movement at this intersection to LOS E; under Funding:City's TIF, <br /> full buildout conditions,this condition would worsen to LOS F. 4.D-1c Same as above for Mitigation Measure 4.D-1c except M-TR-1— <br /> (Impact 4.D-3e) from developer(s) <br /> Improvem <br /> Hopyard Road at Owens Drive Intersection.The addition of ents <br /> identified <br /> vehicle trips generated by Phase I of the EDZ during the PM in Gen. 1. Modify westbound approach:2 left turn, 1 through-right Less than <br /> peak hour would reduce LOS D conditions to LOS E. Full Plan for shared, 1 right turn Significant <br /> buildout of the EDZ would further worsen conditions. (Impact this 2. Un-split eastbound/westbound signal operation <br /> 4.D-3f) intersectio <br /> n <br /> Impact 4.D-5: <br /> Development • Northbound 1-680 On-ramp from the eastbound M-TR-1 Implement TDM Program Significant and <br /> facilitated by the Stoneridge Drive merge(PM Peak Hour) Unavoidable due to <br /> proposed EDZ would • Northbound 1-680 On-ramp from the westbound uncertainty about <br /> affect levels of Stoneridge Drive merge(PM Peak Hour) ultimate Caltrans <br /> service for freeway Freeway congestion-relieving improvements including: approval for 1-680, I- <br /> ram s at • Southbound 1-680 On-ramp from the eastbound 580 improvements. <br /> p second phase of I-680/1-580 interchange improvements, <br /> merge/diverge areas Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) 4.D-2 widening of State Route 84,and other planned roadway Funding:Other <br /> within 1-680 under Southbound 1-680 Off-ramp to Stoneridge Drive diverge system modifications. funding(i.e.,not the <br /> Existing plus (AM Peak Hour) City's TIF) <br /> Project conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.