My WebLink
|
Help
|
About
|
Sign Out
RES 201131
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES 201131
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2020 11:46:16 AM
Creation date
2/7/2020 11:45:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
PERMANENT
NOTES
JDEDZ RFSEIR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 (continued) <br /> SUMMARY OF POTENTIALLY SIGNIFICANT TRANSPORTATION AND TRAFFIC IMPACTS <br /> Impact Location Affected Mitigation Physical Improvement or Other Mitigation Level of Impact <br /> Measure After Mitigation <br /> Impact 4.D-7: • Northbound 1-680 On-ramp from the eastbound <br /> Development Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) M TR 1 Implement TDM Program <br /> facilitated by the Significant and <br /> proposed EDZ would • Northbound 1-680 On-ramp from the westbound Unavoidable due to <br /> affect levels of Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) uncertainty about <br /> service for freeway ultimate Caltrans <br /> • Southbound 1-680 On-ramp from the eastbound approval for 1-680, (- <br /> ramps at Freeway congestion-relieving improvements including: <br /> Stoneridge Drive merge(AM Peak Hour) 580 improvements. <br /> merge/diverge areas 4.D-2 second phase of 1-680/1-580 interchange improvements, <br /> within 1-680 under • Southbound 1-680 On-ramp from the westboundwidening of State Route 84, and other planned roadway Funding:Other <br /> Far-term Stoneridge Drive merge(AM Peak Hour, PM Peak Hour) system modifications. funding(i.e.,not the <br /> (Cumulative)plus . Southbound 1-680 Off-ramp to Stoneridge Drive diverge City's TIF) <br /> Project conditions. <br /> (AM Peak Hour) <br /> Impact 4.D-9: Following City review of design plans for club retail and other <br /> Development of the traffic-intensive uses that would be developed as part of <br /> EDZ would increase Phase 1 and buildout of the EDZ, one or more of the following <br /> traffic safety hazards improvements shall be implemented upon City's <br /> for vehicles, determination that Johnson Drive improvements are required: <br /> bicyclists, and 1. If a club retail use is proposed for Parcel 6, signalize one <br /> pedestrians on public or more entrances at Parcel 6, and widen Johnson Drive at <br /> roadways due to Johnson Drive. Implementation of the Project could affect this location,to accommodate a southbound left-turn pocket <br /> roadway design vehicular, bicycle, and pedestrian traffic along Johnson Drive, and a northbound right turn pocket. 2.Widen Johnson Drive Less than <br /> features, especially in relation to movements into and out of new uses 4.D 3 to provide up to two vehicle travel lanes in each direction Significant <br /> incompatible uses,or developed along Johnson Drive. from Stoneridge Drive to the main entries of sites with traffic- <br /> project-related intensive uses(such as club retail). 3. Implement other <br /> vehicles trips improvements as needed at major driveways(signal control, <br /> provision of left-turn or right-turn pockets)to provide <br /> additional capacity. 4. Final design of all improvements along <br /> Johnson Drive shall maintain or enhance existing bicycles, <br /> transit,and pedestrian facilities,and shall ensure bicycle and <br /> pedestrian facilities and access to the Alamo Canal Trail at <br /> the signalized crossing at Commerce Circle and any other <br /> signalized locations on Johnson Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.