Laserfiche WebLink
3. Implement other improvements as needed at major driveways (signal <br /> control,provision of left-turn or right-turn pockets)to provide additional <br /> capacity. <br /> 4. Final design of all improvements along Johnson Drive shall maintain or <br /> enhance existing bicycles,transit, and pedestrian facilities, and shall <br /> ensure bicycle and pedestrian facilities and access to the Alamo Canal <br /> Trail at the signalized crossing at Commerce Circle and any other <br /> signalized locations on Johnson Drive. <br /> Site(s) affected: All sites within the Project(Phase I and Full Buildout). <br /> Mitigation Measure 4.D-4: Retention of Bicycle Lanes on Stoneridge Drive. Final <br /> design of all improvements along Stoneridge Drive shall maintain or enhance <br /> existing bicycles and pedestrian facilities. <br /> Site(s) affected: All (Phase I and Full Buildout). <br /> (Draft SEIR,pp. 4.D-57 to 4.D-60.) <br /> Impact 4.D-11 <br /> Operation of uses within the Project would be inconsistent with adopted polices, plans, <br /> and programs supporting alternative transportation. <br /> The Revised Final SEIR evaluates the impact of the Project related to alternative <br /> transportation. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the Project that would avoid the <br /> significant environmental effect as identified in the Revised Final SEIR. <br /> Implementation of Mitigation Measures 4.D-3 and 4.D-4 would reduce this <br /> impact to a less than significant level and are incorporated into the Project. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact would be reduced to less than significant. <br /> 1. Implementation of the Project could affect bicycle and pedestrian traffic as <br /> well as transit service along Johnson Drive, especially in relation to <br /> movements into and out of new uses developed along Johnson Drive. <br /> 2. Mitigation Measures 4.D-3 and 4.D-4 set forth in Table 5-1 of the Final <br /> SEIR, listed in the RMMRP, and included in the Findings for Impact 4.D- <br />