Laserfiche WebLink
Bringhurst LLC at 990 Sycamore Road <br /> Initial Study and Negative Declaration <br /> Table 1: Existing and Proposed Specific Plan Land Use Designations and Lot Sizes <br /> Existing Proposed <br /> Lot No. Land Use Minimum Lot Size Lot No. Land Proposed Lot <br /> Lot Size Use Size <br /> Lot 1 PUD-A 34,539 sq. ft. <br /> Lot 5 64,141 sq. ft. <br /> Not 24 PUD-A 1 Acre 3.28 <br /> Acres Lot 2 PUD- 14,898 sq. ft. <br /> Lot 3 MDR 14,866 sq. ft. <br /> Lot 4 14,617 sq. ft. <br /> The multi-use trail shown in the NSSP follows the alignment of Sycamore Creek <br /> through the project site. The applicant proposes to realign this planned trail location <br /> on the project site from its current terminus at the Bridle Creek development to head <br /> south along Dale Way, and then turn east along the property frontage on Sycamore <br /> Road to be connected to the Alisal Trail which is proposed to be constructed by <br /> another development. <br /> 3. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED <br /> The environmental factors checked below would be potentially affected by this <br /> project, involving at least one impact that is a "Potentially Significant Impact," as <br /> indicated by the checklist on the following pages. <br /> Aesthetics Agriculture and Forestry Air Quality <br /> Resources <br /> Biological Resources Cultural Resources Geology/Soils <br /> Greenhouse Gas Hazards and Hazardous Hydrology/Water <br /> Emissions Materials Quality <br /> Land Use / Planning Mineral Resources Noise <br /> Population / Housing Public Services Recreation <br /> Transportation /Traffic Utilities/Service Mandatory Findings of <br /> Systems Significance <br /> 9 <br />el <br /> into five residential lots for four new homes and one existing home. <br /> Please refer to Figure 3 for the proposed site layout. <br />nd two <br /> outbuildings, located towards the southeast portion of the property. Sycamore <br /> Creek runs northwesterly-southeasterly through the site. Access to the existing home <br /> is provided by a 15-foot wide driveway from Sycamore Road. This driveway crosses <br /> a wooden bridge over the creek before it reaches the existing residence. There are <br /> a number of mature trees on the property including native valley oak, sycamore, <br /> and California black walnut trees; these are generally located in the southern <br /> portion of the site and adjacent to the creek. Non-native trees including eucalyptus, <br /> 4 <br />at would be amenities, because a design for connection of a trail would be ready <br /> in the near term, she recommended funding be provided by the applicant to the City to be used <br /> for the highest priority projects in the bike and pedestrian master plan that deal with <br /> connectivity, especially in south Pleasanton. One in particular is the circuit bicyclists take from <br /> Sycamore to Foothill and then around Foothill. One of the key provisions is for a wider bike <br /> lane on Foothill so there is a logical connection to improving bicycling along the corridor here <br /> that is realistic in the near term and money can do that. She asked that staff look at other <br /> options along those lines, and how much of a contribution was realistic based on splitting the <br /> difference of the profit a land owner would receive by having the additional two parcels. <br /> Excerpt Planning Commission Minutes, July 11, 2018 Page 9 of 11 <br />, 2018 Page 3 of 11 <br />Way, existing lots range from 15,033 sq. ft. (5769 Hanifen Way)to 20,313 sq. <br /> ft. (1008 Sycamore Creek Way). <br /> P18-0075, 990 Sycamore Road Planning Commission <br /> 11of16 <br /> 'Y a 0421 0 0 �I ,�� r •u"' - 36. <br /> ,`a yy�� n2+a /'�. oM 'le' k� W, k <br /> 3S 94 '@ g 'via <br /> R T3 <br /> 1:5,300 <br /> 0 0.05 0.1 mi PUD-89-06-08M, Gabriela Marks, 4210 Rosewood Drive Planning Division _ <br /> January 7 2020 `( �� ""��� <br /> 0 330 660 Feet I Y <br /> I , I I <br />