Laserfiche WebLink
<br />.. <br /> <br />Facts in Sqpnort ofFindini: The impact will be avoided or reduced based on the <br />following: <br /> <br />a. Impact C7 will not occur since recycled water is no longer a feature of the <br />September 1998 Specific Plan. Mitigation Measure C7 is a requirement of the Project <br />based on other potential impacts and would address this impact if recycled water were to <br />become available to the Project. <br /> <br />D. INFRASTRUCTURE SYSTEMS: W ASTEW A TER <br /> <br />1. Imoact D 1. Potential interference with existing on-site sewer main during <br />construction. <br /> <br />Mitil!ation Measures: <br />Measure Dla. Relocate main and pump station, if necessary for this project. to a site <br />providing satisfactory access, with no disruption of existing flows during the relocation <br />process. <br /> <br />Measure D 1 b. Follow best available practices for either abandoning the main and pump <br />station in place or removing them in order to minimize health hazards. <br /> <br />Findinl!: Changes or alterations have been required in, or incorporated into, the Project <br />which avoid or substantially lessen the significant environmental effect identified in the <br />final EIR to a less than significant level. <br /> <br />Facts in Suooort of Findinl!: The impact will be avoided or reduced based on the <br />following: <br /> <br />a. The September 1998 Specific Plan, Public Facilities and Service Element, <br />Wastewater Policy 3 and Guideline 3.1 calls for adequate access to the relocated facilities <br />and no disruption of existing wastewater flows. <br /> <br />b. The September 1998 Specific Plan, Public Facilities and Service Element, <br />Wastewater Policy Guideline 3.2 and Master PUD Condition 69 incorporate Mitigation <br />Measure D I b. Best available practices incorporate state-of-the-art techniques developed <br />by experts to ensure that the abandonment will not result in any health hazards. <br />Implementation of these practices will be monitored by the City. <br /> <br />2. Imoact D2. Cumulative increase in demand for treatment capacity. <br /> <br />Mitil!ation Measures: <br />Measure D2a. Require payment of connection fees. <br /> <br />Measure D2b. Phase development so that demand for wastewater treatment capacity does <br />not exceed capacity available to the City of P1easanton. <br /> <br />SF:FMP\AOR\WEX\61138664.2 <br />062499 <br /> <br />A-13 <br /> <br />WEX....a3 <br />