Laserfiche WebLink
<br />Measure D3d. Require water conservation measures. <br /> <br />Measure D3e. Plan and build the on-site wastewater collection system to minimize <br />infiltration and inflow. <br /> <br />Measure D3f. If export capacity becomes unavailable as the project develops, undertake <br />measures to offset the project's demand for export capacity. <br /> <br />Findimz: Changes or alterations have been required in, or incorporated into, the Project <br />which avoid or substantially lessen the significant environmental effect identified in'the <br />Final EIR. to a less than significant level. <br /> <br />Facts in SUDDort ofFindin2: The impact will be avoided or reduced based on the <br />following: <br /> <br />a. LA VWMA plans to expand its capacity. LA VWMA certified its expansion <br />plan EIR. and approved the expansion in July 1998. Under this plan, Pleasanton will be <br />entitled to 14.4 million gallons per day (MGD) of export capacity (almost twice its current <br />entitlement). The LA VWMA expanded capacity should be available in approximately <br />2003. The expanded capacity will accommodate the Project and future cumulative <br />demand. <br /> <br />b. Master PUD Condition 72 requires payment of connection fees to allow <br />LA VWMA to construct its expansion project. <br /> <br />c. The Bernal Property Pre-annexation Development Agreement provides this <br />reservation and guarantee. <br /> <br />d. Mitigation Measure D3d is identical to Measure C1b and the findings <br />thereunder are incorporated by reference. <br /> <br />e. Master PUD Condition 69 requires the on-site system to be built in <br />accordance with City standards which require the system to minimize infiltration and <br />inflow. <br /> <br />f. Mitigation Measures D3b and D3f are not necessary given the <br />implementation of other mitigations which reduce this impact. <br /> <br />SF:FMP\AGR\WEX\61131664.2 <br />062..99 <br /> <br />A-IS <br /> <br />WEX-66013 <br />