Laserfiche WebLink
new opportunities for industrial development. Therefore, staff believes there would be <br /> adequate remaining land in the City to accommodate industrial development opportunities <br /> consistent with the existing General Plan land use designations; especially within the nearby <br /> areas to the north of the project area on Commerce Circle, east of the project area on Owens, <br /> Franklin, and Johnson Drives, and farther to the east within Hacienda. <br /> As indicated above, the project would promote goals, policies, and programs related to <br /> encouraging appropriate infill development, allowing reuse of vacant and underutilized parcels, <br /> and promoting the Economic Development Strategic Plan. <br /> Zoning and Uses <br /> The parcels within the project area are zoned PUD-G&LI District, PUD-I/C-O District, and <br /> I-G-40,000 District. The 12 parcels in the JDEDZ would be rezoned to PUD-C District, which <br /> would establish a list of permitted and conditionally permitted uses that would allow a wide <br /> range of commercial uses. The proposed list of uses (Exhibit C) do not necessarily emulate <br /> any one existing commercial zoning district within the Pleasanton Municipal Code; rather, they <br /> were selected to allow for commercial diversity and to promote vitality within the project area. <br /> Each use was evaluated and selected to ensure a mix of uses with both local and regional <br /> market draw potential to capitalize on the project area location along both local arterial streets <br /> and regional transportation corridors. The proposed uses include, but are not limited to, club <br /> retail, hotels, restaurants, bars and brewpubs, microbreweries, food stores, department stores, <br /> gymnasiums, and offices. Staff believes these uses will achieve the desired commercial <br /> character described in the project goals and objectives above and, accordingly, is <br /> recommending approval of the proposed rezoning to PUD-C, subject to the proposed list of <br /> uses. <br /> As stated above, one of the primary goals of the JDEDZ is to streamline the development <br /> review process for new land uses through both completed CEQA documentation and <br /> staff-level review processes. Accordingly, staff is proposing the majority of the proposed uses <br /> within the JDEDZ be permitted (as opposed to conditionally permitted), with any new <br /> construction associated with those permitted uses subject to staff-level Design Review and <br /> verification of compliance with the recommended design guidelines (Exhibit C). Staff believes <br /> those uses identified as permitted do not represent uses the City would typically place <br /> operational controls on due to significant noise, objectionable odors, or activities that could be <br /> detrimental to the general health, safety, and welfare of the public and/or to surrounding uses. <br /> Moreover, the recommended design guidelines would ensure desirable and attractive <br /> buildings, adequate landscaping and site amenities, and signage criteria consistent with typical <br /> City development standards. By approving the majority of the proposed uses as permitted and, <br /> if necessary, subject to staff-level Design Review, the entitlement process for many types of <br /> projects would be shortened (with potential reductions of 2-6 months off the typical approval <br /> process). The streamlined approval is designed to incentivize the development of new <br /> businesses within the JDEDZ — a primary objective of the proposal. <br /> As permitted uses, applicants would simply be required to obtain approval of a zoning <br /> certificate from the Planning Division (over the counter and typically subject to one-day <br /> processing), and, if necessary, submit a staff-level Design Review application which are <br /> processed in approximately two to three weeks after receipt of a complete application. Uses <br /> that would require a Conditional Use Permit require a public hearing and typically take <br /> approximately six to twelve weeks to process after receipt of a complete application. <br /> P14-0852 and PUD-105, JDEDZ Planning Commission <br /> 8 of 15 <br /> ,,,..., w <br /> '-` V, , <br /> ' :# \ I. # ..„ , <br /> 3409 3436 , 3439 c,,,,,,, p 3 u, <br /> , 17,, 406. '-• o- • 343 n5 ''' <br /> 3640 3636 -..,,,90 <br /> '' \ 4,\,i, ' 4 <br /> 0 <br /> -A <br /> A '--, ' / ' `') } '\'if , w\tis,"/ V , <br /> itiib/ ifo,, /1*-4•1 4 <br /> A 3656 .1 ,,.;,' , 1 J - I <br /> -- <br /> - <br /> rI <br /> ./7 '-' 17 Fairlands o <br /> ".) .L. , IF0j23 / <br /> V <br /> mfl'f 'S <br /> . l' 0' (-1/ <br /> 4VA'" c:T <br /> i <br /> , V 7 <br /> .... '',.., <br /> 7 <br /> _ ..... „. <br /> f I <br /> M :I <br /> 3289 <br /> 7, 60; <br /> .s114 301 <br /> ,37 <br /> ... eich 31 AR 3195 al ' <br /> 1:3,800 <br /> 0 0.0475 0.095 mi P19-0283, 6700 Santa Rita Rd, Panache Academie Planning Division <br /> November 18,2019 r, <br /> 0 237.5 475 Feet <br />