Laserfiche WebLink
P19-0130, 7218 Moss Tree Way <br /> October 4, 2019 <br /> Page 2 <br /> If you have any questions about building permit fees or the building permit process, please <br /> contact the Building and Safety Division at 925-931-5300. <br /> Any interested party may file an appeal of this approval within 15 days of the date of <br /> approval. Further, per Pleasanton Municipal Code section 18.144.010, the City Council may <br /> elect to review this action within 15 days following the date of approval, or at its next regular <br /> meeting (October 15, 2019), whichever is later. Therefore, approval of the Administrative <br /> Design Review will become effective on October 22,2019, unless appealed prior to that time. <br /> Administrative Design Review approval shall lapse and become void one year following the <br /> effective date of project approval, unless prior to the expiration of one year,a building permit is <br /> issued and construction is commenced and diligently pursued toward completion or an extension <br /> has been approved by the City. <br /> If you have any questions, please feel free to give me a call at 925-931-5615. <br /> Sincerely, <br /> Jenny Soo <br /> Associate Planner <br /> c: Fayyaz Malik, 7218 Moss Tree Way, Pleasanton, CA 94566 <br /> Niraj and Harsha Gandhi, 7228 Moss Tree Way, Pleasanton, CA 94566 <br /> A COPY OF THIS LETTER AND A COMPLETED BUILDING PERMIT <br /> QUESTIONNAIRE (ATTACHED)MUST BE PRESENTED TO THE BUILDING AND <br /> SAFETY DIVISION WHEN APPLYING FOR BUILDING PERMITS. THE <br /> QUESTIONNAIRE MUST THEN BE SUBMITTED TO THE PLANNING DIVISION. <br /> appeal period or, if you wish to apply for a building permit before the end of the <br /> appeal period, upon submittal of a signed Waiver Form to the Planning Division. The waiver <br /> acknowledges that plan check fees may be forfeited in the event that the approval is overturned <br /> or the design is significantly changed as a result of an appeal. In no case will a building permit be <br /> issued before the end of the appeal period. <br /> At the time of building permit submittal,you must: <br /> a. submit a completed and signed Building Permit Questionnaire (attached)to the <br /> PLANNING DIVISION; and <br /> b. present a copy of this letter to the Building and Safety Division along with required plans. <br /> COMMUNITY DEVELOPMENT P. 0. BOX 520 200 Old Bernal Avenue <br /> www.cityofpleasantonca.gov Pleasanton,CA 94566-0802 <br /> Planning Building&Safety Code Enforcement Permit Center Traffic Engineering <br /> (925)931-5600 (925)931-5300 (925)931-5620 (925)931-5630 (925)931-5677 <br /> Fax: 931-5483 Fax: 931-5478 Fax: 931-5478 Fax: 931-5478 Fax: 931-5487 <br />effect before the Building Division will issue permits. <br /> {end} <br />ning Manager <br /> Julie Harryman, Assistant City Attorney <br /> Brian Dolan, Assistant City Manager/Acting Director of Community Development <br /> P19-0130 Planning Commission <br /> 15 of 15 <br />ength of the garage wall. Based on comments, it was modified to include a <br /> As previously noted,the project site is located in a PUD district where the underlying PUD requires a side-yard setback of <br /> 10 feet(one side)and 20 feet(combined).The existing home,as constructed, is set back 15 feet from the west property line <br /> at its closest point,a larger setback than the standards would require. The proposed addition would be built directly above the <br /> existing garage and would maintain the existing building setback. <br /> P19-0130 Planning Commission <br /> 11 of 15 <br />