Laserfiche WebLink
20. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy. <br /> 21. FIREPLACES AND FIRE PITS: Fireplaces and fire pits shall be gas fireplaces, pellet fueled wood <br /> heaters, or EPA certified wood-burning appliances. The fireplace types shall be indicated on the <br /> plan and/or specification sheet(s) submitted to for issuance of building permits. (Project Specific <br /> Condition) <br /> 22. GRADING AND DRAINAGE/IMPROVEMENT PLANS: The applicant's California licensed civil <br /> engineer shall prepare a Grading and Drainage Plan and an improvement plan that include the <br /> typical and special cross sections; existing and proposed sanitary sewer storm drain and water <br /> improvements; grading (existing and proposed contour lines); proposed retaining wall heights, <br /> materials and colors; driveways; subdrains; replacement of deficient frontage improvements; <br /> construction of frontage improvements; flood zone limits; seismic fault zone limits; existing and <br /> proposed easements; existing and proposed lot lines; storm water pollution control plan; storm <br /> water management plan; existing tree locations and driplines; and other details as determined by <br /> the Directors of Community Development and Engineering/City Engineer. (Project Specific <br /> Condition) <br /> Green Building and Sustainability Measures <br /> 23. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: The residence shall be <br /> constructed to allow for future installation of a photovoltaic (PV) system and a solar water heating <br /> system. The measures shall be shown on the building permit plans for review and approval by the <br /> Director of Community Development prior to building permit issuance. The applicant shall comply <br /> with the following requirements for making the unit on the subject site photovoltaic-ready and <br /> solar water heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br /> building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to alternating <br /> current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> 24. GREEN BUILDING — RESIDENTIAL NEW CONSTRUCTION: Prior to building permit issuance, a <br /> list of the green building measures used in the design, covered by this approval, shall be provided <br /> to the Planning Division for review and approval by the Director of Community Development. The <br /> home covered by this approval shall be designed to achieve a "certified rating" of a minimum of <br /> 50 total points, achieving at least the minimum points in each category, using BuildltGreen's <br /> current Green Points rating system. The green building measures shall be shown on the building <br /> permit plans submitted to the Building and Safety Division. Each proposed point identified shall <br /> have a notation indicating the sheet(s) the point can be found. A special inspection by the <br /> Planning Division shall be coordinated with regards to exterior materials. Prior to building permit <br /> final, all of the green building measures indicated on the approved checklist shall be inspected <br /> and approved by either the City of Pleasanton, a third party rater, or the applicant shall provide <br /> written verification by the project engineer, architect, landscape architect, or designer. (Per PMC <br /> 17.50) <br /> P19-0151 Planning Commission <br /> Page 4 of 12 <br />ce to the <br /> approved building heights as shown on Exhibit B or as otherwise conditioned. <br /> P19-0151 Planning Commission <br /> Page 3 of 12 <br />