My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
101719
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:18:12 PM
Creation date
10/11/2019 4:22:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
project be reconsidered by the Planning Commission and <br />City Council in Fall 2019. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Eric Luchini <br />40. Lions Wayside/DelucchiI Other <br />Park Master Plan — <br />Permitting <br />Development of final design and construction documents for the parks master plan is <br />pending state and federal permitting to underground the "channel" at Lions Wayside <br />Park. Based on comments from permitting agencies, staff is developing options for the <br />park improvements that do not require undergrounding of the channel due to the <br />regulatory agencies' position that it will not be allowed. <br />• Status <br />Under Review <br />• Next Steps/Details: <br />At the January 2019 meeting of the Parks and Recreation <br />Commission, three potential designs were presented for <br />discussion and review. Commissioners discussed the <br />various advantages and disadvantages of each design, and <br />proposed changes to two of the designs for further <br />refinement and study. <br />• Applicant: <br />City of Pleasanton <br />• Staff Contact(s): <br />Sean Welch <br />TRANSPORTATION PROJECTS <br />Transportation Planning <br />41. Bicycle and Pedestrian Transportation/Traffic Project <br />Master Plan High Priority <br />Corridor <br />The Pedestrian and Bicycle Master Plan, created in January 2010 was updated and <br />adopted by City Council in June 2017. The update created an "All users and abilities" <br />approach to facility design and provided a corridor construction priority. West Las <br />Positas Boulevard was identified as the highest priority corridor and design is underway <br />to develop bicycle and pedestrian improvements along the corridor. <br />• Status Under Review <br />• Next Steps/Details: Toole Design Group has completed draft corridor design <br />options for West Las Positas. Option 1 uses standard <br />buffered bike lanes and Option 2 uses a 2 way cycletrack <br />along the south side of West Las Positas. The design <br />options will be posted in early June <br />• Applicant: City of Pleasanton <br />• <br />Staff Contact(s): Mike Tassano <br />Page 13 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.