My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
101519
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 4:41:22 PM
Creation date
10/9/2019 4:15:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/15/2019
DESTRUCT DATE
15Y
Document Relationships
16 ATTACHMENT 4 (PLANS)
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\101519
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Building <br /> • Demolish existing on-site buildings and structures including: <br /> O 1,962-square-foot auto service/smog check building; <br /> O 1,325-square-foot fuel station canopy; and <br /> o 2,224-square-foot 7-Eleven convenience store. <br /> • Construct the following new buildings and structures: <br /> o An approximately 1 ,290-square-foot drive-through carwash building; <br /> o An approximately 3,311-square-foot fuel station canopy, which would be <br /> located over reconstructed pump islands with two additional fuel pumps <br /> for a total of six fuel pumps (12 dispensers); <br /> o An approximately 3,034-square-foot 7-Eleven convenience store; and <br /> o New trash enclosure. <br /> Operation <br /> • Cease operation of the existing smog check business; <br /> • Maintain operation of a 24-hour 7-Eleven convenience store with the sale of <br /> alcoholic beverages; <br /> • Maintain operation of the existing 24-hour self-service fuel station; and <br /> • Operate a self-service drive-through carwash from 7 a.m.-10 p.m. <br /> Site Development <br /> • Shift the existing driveway on West Las Positas Boulevard 10 feet easterly; <br /> • Eliminate the existing driveway from Hopyard Road to the existing 7-Eleven <br /> convenience store; <br /> • Widen the southernmost driveway at the existing Shell station on Hopyard <br /> Road from 35 feet to 40 feet; <br /> • Eliminate the existing internal drive aisle connecting the 7-Eleven <br /> convenience store site to the adjoining church property to the south; <br /> • Remove existing trees that would be impacted by the proposed project and <br /> landscaping between the Shell fuel station and 7-Eleven store; <br /> • Install new landscaping on the project site; <br /> • Modify on-site circulation and install 17 parking spaces and a loading space; <br /> • Add one underground fuel storage tank for diesel fuel; <br /> • Install four bioretention areas in the landscape planters to treat on-site <br /> stormwater runoff prior to being discharged to the City stormwater system; <br /> and <br /> • Install a bicycle rack and locker near the convenience store between the <br /> parking and the loading area. <br /> Figure 2 shows the proposed site plan. <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.