My WebLink
|
Help
|
About
|
Sign Out
3
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2010-2019
>
2019
>
09-25
>
3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 12:32:34 PM
Creation date
9/18/2019 11:25:14 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/25/2019
Document Relationships
3_Exhibit B - Plans
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\09-25
3_Exhibits A & C-F
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\09-25
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
42 on-site parking spaces conforms with the PMC requirements and, therefore, staff believes <br /> adequate parking would be provided for the proposed project. <br /> Traffic <br /> The City's Traffic Engineer has evaluated the traffic impacts due to the proposed project. At <br /> the direction of the City Traffic Engineer, a Traffic Impact Analysis (TIA) report was prepared. <br /> The TIA acknowledged that under future conditions, both with and without the project, level of <br /> service (LOS) at the various study intersections would worsen, but, in the near term, all of <br /> these intersections would continue to operate at an acceptable LOS. However, under <br /> long-term, cumulative conditions, the TIA found that the southbound approach (Larkspur <br /> Landing) of the unsignalized intersection at Owens Drive and the Larkspur Landing driveway <br /> would deteriorate from LOS E to LOS F with the addition of the project trips during both the AM <br /> and PM peak hours. The TIA also notes that the increased number of U-turns necessitated by <br /> this new median could increase queue lengths at the Johnson Drive/Owens Drive intersection. <br /> The project would be required to implement the following mitigations, which would ensure all <br /> intersections operate acceptably: <br /> • Construct a raised channel median at the intersection of Owens Drive and the Larkspur <br /> Landing Hotel driveway to prevent left turn movements from both the Larkspur Landing <br /> Hotel driveway on the north side of Owens Drive and the Tommy T's driveway on the <br /> south side of Owens Drive. <br /> • Pay into the Traffic Impact Fund (TIF) to cover the City's expenses for any signal timing <br /> changes in the immediate vicinity as deemed necessary by the City's Traffic Engineer. <br /> • Install ADA compliant ramps on both sides of Johnson Court and install a crosswalk. <br /> These mitigations have been incorporated into the recommended conditions of approval for the <br /> proposed project and staff supports the project as conditioned. <br /> Architectural Design <br /> The subject parcel is highly visible from the intersection of Owens Drive and Hopyard Road, <br /> which is a "gateway" location into Pleasanton. Accordingly, staff worked closely with the <br /> applicant to refine the building architecture with specific focus on the south (rear) elevation <br /> facing Owens Drive to ensure the new commercial building would be reflective of the design <br /> character and quality typically seen in Pleasanton. Staff directed the applicant to incorporate <br /> traditional architectural elements into the overall design and to ensure the south (rear) <br /> elevation replicated the same storefront and architectural quality exhibited on the north (front) <br /> elevation. The proposal now includes varying exterior materials (stucco, brick and stacked <br /> stone), and techniques that add architectural interest such as varying wall plane depths, <br /> varying roof heights and parapet treatments, recessed storefront and entrances, material and <br /> color changes, horizontal belly bands and wainscoting, canvas awnings, wood arbors, and <br /> various other ornamental treatments comprised of both stucco and metal. Staff believes the <br /> proposed architecture reflects the high-quality design and materials required for this prominent <br /> location. <br /> P16-1349 and PUD-121, 6455 Owens Drive Planning Commission <br /> 13 of 15 <br />proposed within the new commercial building and the applicable parking <br /> requirements for each land use prescribed by the PMC. As conditioned, the proposed <br /> P16-1349 and PUD-121, 6455 Owens Drive Planning Commission <br /> 12 of 15 <br />,,,N.4,--,f', <br /> ^a 'u` ^ ^. + ' <br /> (/Ar. ,1h L. ..Ltt,,.w. b b0'j � f�i� �� (f y r A. � R .��.' 1 <br /> R <br /> r, Ns DR *_- <br /> { <br /> P16-1349 and PUD-121, 6455 Owens Drive Planning Commission <br /> 10 of 15 <br />