My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
081519
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:13:32 PM
Creation date
8/12/2019 12:29:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
approach to facility design and provided a corridor construction priority. West Las <br />Positas Boulevard was identified as the highest priority corridor and design is underway <br />to develop bicycle and pedestrian improvements along the corridor. <br />• Status <br />Under Review <br />• Next Steps/Details: <br />Toole Design Group has completed draft corridor design <br />options for West Las Positas. Option 1 uses standard <br />buffered bike lanes and Option 2 uses a 2 way cycletrack <br />along the south side of West Las Positas. The design <br />options will be posted in early June on www.wlpbike.com <br />A public meeting will be held along with other events to <br />receive public input on the project options. The design <br />process is anticipated to continue through the summer. <br />• Applicant: <br />City of Pleasanton <br />• Staff Contact(s): <br />Mike Tassano <br />43. Overcrossing Improvement Transportation/Traffic Project <br />Plan for Pedestrians and <br />Bicycles <br />City Council at its September 13, 2016 meeting awarded the Freeway Overcrossing <br />Improvement Plan project. This plan identified needed improvements and an <br />implementation strategy to improve bicycle and pedestrian facilities at the freeway <br />overcrossings. Included with project deliverables is a set of plans for each overcrossing <br />that will be used for future construction. The plans are completed and will be presented to <br />City Council in November of 2018. <br />• Status Under Review <br />• Next Steps/Details: The Overcrossing Improvement Plans were presented to <br />the City Council in December of 2018. Per City Council <br />direction, staff is conducting additional analysis to <br />determine the feasibility of the improvements. Analysis <br />set to be completed in Summer 2019. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Mike Tassano <br />44. Bernal Avenue at Nevada Transportation/Traffic Project <br />Street Traffic Signal <br />Installation <br />Nevada Street is currently under construction to connect Stanley Boulevard to Bernal <br />Aenue. When completed the increased volume on Nevada Street requires a traffic signal <br />to be constructed at Bernal Avenue. When properly used, traffic signals are valuable <br />devices for the control of vehicular and pedestrian traffic. They assign the right-of-way to <br />the various traffic movements and profoundly influence traffic flow while reducing the <br />frequency and severity of certain types of crashes, especially right-angle collisions. <br />• Status Under Review <br />• Next Steps/Details: Complete design and construct summer 2019 <br />Page 14 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.