My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
081519
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:13:32 PM
Creation date
8/12/2019 12:29:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
supplemental environmental review is complete, additional public comment will occur, <br />and the City Council will consider reapproving the project. Although this project has <br />already been subject to extensive environmental review, the City believes that this is the <br />most effective way to provide the public and public officials with information and allow <br />for reconsideration of the project. Costco is in support of this approach and is a signatory <br />to the stipulation. <br />• Status Under Review <br />• Next Steps/Details: The City has completed and recirculated supplemental air <br />quailty analysis as of July 10, 2019. The recirculation <br />period is 45 days and ends on August 23, 2019. The <br />project be reconsidered by the Planning Commission and <br />City Council in Fall 2019. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Eric Luchini <br />41. Lions Wayside/Delucchi Transportation/Traffic Project <br />Park Master Plan — <br />Permitting <br />Development of final design and construction documents for the parks master plan is <br />pending state and federal permitting to underground the "channel" at Lions Wayside <br />Park. City staff met with the permitting agencies in April 2016 and are currently <br />developing options for the park improvements that do not require undergrounding of the <br />channel due to the regulatory agencies' position that it will not be allowed. <br />• Status Under Review <br />• Next Steps/Details: At the January 2019 meeting of the Parks and Recreation <br />Commission, three potential designs were presented for <br />discussion and review. Commissioners discussed the <br />various advantages and disadvantages of each design, and <br />proposed changes to two of the designs for further <br />refinement and study. Proposed designs are tentatively <br />scheduled to be brought back to the Parks and <br />Commission for review and discussion in March. Site <br />survey work necessary for a final design is scheduled to <br />begin in February. <br />• Applicant: City of Pleasanton <br />• Staff Contact(s): Gerry Beaudin <br />TRANSPORTATION PROJECTS <br />Transportation Planning <br />42. Bicycle and Pedestrian Transportation/Traffic Project <br />Master Plan High Priority <br />Corridor <br />The Pedestrian and Bicycle Master Plan, created in January 2010 was updated and <br />adopted by City Council in June 2017. The update created an "All users and abilities" <br />Page 13 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.