shall be reviewed and approved by the Director of Community Development prior to building
<br /> permit issuance.
<br /> 12. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a
<br /> site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These
<br /> plans shall be approved by the Chief Building Official prior to building permit issuance. The site
<br /> development plan shall include all required information to design and construct site, grading,
<br /> paving, drainage, and utilities.
<br /> 13. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification
<br /> prepared by a California licensed land surveyor or registered civil engineer to the Chief Building
<br /> Official and Director of Community Development certifying the pad elevations and building
<br /> locations (setbacks) are conforming to the approved plans, prior to receiving a foundation
<br /> inspection for the structures.
<br /> 14. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height certification
<br /> prepared by a California licensed land surveyor or civil engineer to the Director of Community
<br /> Development before the first framing or structural inspection by the Building and Safety Division.
<br /> The height of the structures shall be surveyed and verified as being in conformance to the
<br /> approved building heights as shown on Exhibit B or as otherwise conditioned.
<br /> 15. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy.
<br /> 16. FIREPLACES AND FIRE PITS: Fireplaces and fire pits shall be gas fireplaces, pellet fueled wood
<br /> heaters, or EPA certified wood-burning appliances. The fireplace types shall be indicated on the
<br /> plan and/or specification sheet(s) submitted to for issuance of building permits. (PROJECT
<br /> SPECIFIC CONDITION)
<br /> Biological Mitigation Measures
<br /> 17. The final determination of the jurisdictional status over the intermittent and ephemeral
<br /> watercourses of the Yee property will be made by the United States Army Corps of Engineers
<br /> (USACE), the Regional Water Quality Control Board (RWQCB), and the California Department of
<br /> Fish and Wildlife (CDFW) in conjunction with their permitting processes before submittal of the
<br /> tentative parcel map. Any impacts to a jurisdictional intermittent and/or ephemeral watercourse
<br /> will require a Section 1602 Streambed Alteration permit. (PROJECT SPECIFIC CONDITION)
<br /> 18. ALAMEDA WHIPSNAKE: To protect Alameda Whipsnakes from construction impacts, the
<br /> applicant shall retain a qualified biologist at least 15 days before the onset of any construction,
<br /> such as the entrance re-alignment, driveway installation, and building envelopes, to install a silt
<br /> fence around these construction areas as well as along the entire upslope edge of all grading
<br /> areas. The fence shall remain in place throughout the project grading and construction phases
<br /> and may only be removed at the discretion of the biologist. The design and location of the silt
<br /> fence shall be shown on all construction drawings including improvement plans, grading plans,
<br /> site plans, and landscape plans to the satisfaction of the Planning Division prior to the issuance of
<br /> a grading construction permit. Failure to maintain the silt fence shall result in the immediate
<br /> issuance of a stop work order and cessation of activity. (PROJECT SPECIFIC CONDITION)
<br /> 19. NESTING BIRDS: The applicant shall retain a qualified biologist to conduct a pre-construction
<br /> survey at least 15 days before the onset of construction to verify the presence of any endangered
<br /> and/or threatened CDFW and USFWS bird species including burrowing owls, raptors, and
<br /> migratory species, if project-construction is scheduled to occur during the nesting season as
<br /> defined by the CDFW. If nesting birds are found, the applicant shall establish a fenced buffer area
<br /> P19-0059 Planning Commission
<br /> Page 3of12
<br /> 427 :,..,„,61665.,,, f
<br /> ,g' LUXti11 a I.L -
<br /> �[ ,443_1:8,,...i1,...'3'--,14445.5-41'0-11_14.22: . '
<br /> ry" 0 �1 202- F�:. �,� P 43017 AI i l)43! 1, ,406! 11.410r411:051_13121-14_4814511
<br /> � 145 ,423 i _�1533 1h`�
<br /> t• m 3 R A L� .. .. _ 1 t / - ,4� 1-- �]4`Y9_+1 1418 1411i1-Q
<br /> ,r. F 'v 2oas } ?' r ( v S I a -T 1 14011 �.J45, i 1414 1415 1535:.:,1527 1 1
<br /> l�I I I 1 it :;f':).i''.407 1520
<br /> ,.4 �� 1 1.148 �, 1515 1x45'
<br /> VALLEY A V ' itr,� D I '� 512 505
<br /> W 993 _ '� .a / , e s`' 1193
<br /> $+_ _
<br /> 1993 ,. 1 - 1 6 \ a g
<br /> Wy ,93 a '
<br /> ,95, RROU!<:1>;IZCF��ti'rY - kTII � M \ 1795 \'797
<br /> yl 1a1/ 1944
<br /> e
<br /> b 1787 v
<br /> • ISI i�
<br /> 939 . - j_____IL".:::::i
<br /> e ,,� �,�
<br /> w• 1965 1952 J \ _ 18gi ,alli3 '�, °n
<br /> n
<br /> ,92. ''4
<br /> „e01
<br /> glaY16.8 �,—� J I ” 0 1
<br /> 83q a i
<br /> 1863 ry , _, ..J
<br /> �iliY.tSchool Q ,90+ -„ ,860.,:-'� ,ems ,�� ^< !� "".� m 1.183 � 3� _ 1734 1638 ,1544 1536 15
<br /> 8x9 ,s„ m '924
<br /> t ,62
<br /> 1265 1
<br /> 44
<br /> m
<br /> ,sea =�=J_ I
<br /> .
<br /> 1 '
<br /> 976 m i 5 , laoe i ,Y U I Et 8
<br /> 979 e `
<br /> ,961 1614 r.,, ,-44 N +947 J � 11 - -
<br /> a +
<br /> C ice
<br /> I 1 I�I \ ��. ��N( I.w�U Si
<br /> ,8315 15,0 ,®7 ,926 � 19215 1967 } 1554 i �
<br /> 1 311
<br /> — 51,1171
<br /> '4 '14p RAN
<br /> 5y�� a q ty
<br /> 1885 180' 1805 1606 1841 1995 i 1992 J v : 17 A �1 b w' 'd1 ' a "' €y 7n R
<br /> MSS` 2 1 `"
<br /> . :id_AmLL)A I)u - 1 ' S: ei - 4 'iA 9 c/1
<br /> m 8 4
<br /> �)� .'- W 1495 1198 ,795 :66
<br /> ,789116991800 = 4 .f__+^ _s i \ _.
<br /> ` - zI. I ).`I.r 1��, �+ C1wti UY 11'Yv64LL:'1++. 615, N1n1 .7:z, 149:1; 2 1n5 16,1 ,�.,eCOITtiTlUltit�' i . c i » S q 0 8 0 S t 4.-. r:tiM. f\ 40U730 173 a 1772 1750 rr 1757 17� 1781 1761 1613 151 Z j"'r`"" 14. ' N ,� �' _ n g o
<br /> 1:4,500 V P
<br /> o 0.05 0.1 mi P19-0140, 1809 Santa Rita Rd. Suite A & B, Hill
<br /> Planning Division
<br /> , i i July 30,2019
<br /> FL£ NTON.
<br /> o 280 560 Feet
<br /> |