Laserfiche WebLink
design details shall be subject to review and approval by the Planning Division prior to issuance <br /> of building permits. <br /> 16. COLOR SCHEME: The applicant shall paint a portion of each building with the color scheme in <br /> substantial conformance with the Approved Plans. Primary and secondary (accent) paint colors <br /> should be painted next to each other on the building, to the extent feasible, for purposes of <br /> inspection for substantial conformance with the Approved Plans. The colors shall not be <br /> considered in substantial conformance with the Approved Plans until after inspection and <br /> verification by the Planning Division. Any proposed modifications shall be subject to review and <br /> approval by the Planning Division. <br /> 17. SIGN PROGRAM: Site and building signage shall be reviewed under a comprehensive sign <br /> program submitted to the Planning Division under a separate application. <br /> 18. OUTDOOR STORAGE: There is to be no outdoor storage without prior approval by the City. <br /> 19. LIGHTING PLAN: The applicant shall submit a lighting plan with the building permit submittal. <br /> The plan shall include photometric contours, manufacturer's specifications on the fixtures, and <br /> mounting heights. All exterior lighting including landscape lighting shall be directed downward <br /> and designed or shielded so as to not shine onto neighboring properties or streets. The <br /> photometrics shall be reviewed and approved by the City Traffic Engineer and Director of <br /> Community Development prior to building permit issuance. The type and location of all exterior <br /> light fixtures shall be reviewed and approved by the Director of Community Development prior to <br /> building permit issuance. <br /> 20. BUILDING SURVEY: The applicant shall submit a building survey and/or record of survey and a <br /> site development plan in accordance with the provisions of Chapter 18.68 of the PMC. These <br /> plans shall be approved by the Chief Building Official prior to building permit issuance. The site <br /> development plan shall include all required information to design and construct site, grading, <br /> paving, drainage, and utilities. <br /> 21. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation certification <br /> prepared by a California licensed land surveyor or registered civil engineer to the Chief Building <br /> Official and Director of Community Development certifying the pad elevations and building <br /> locations (setbacks) are conforming to the approved plans, prior to receiving a foundation <br /> inspection for the structures. <br /> 22. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height certification <br /> prepared by a California licensed land surveyor or civil engineer to the Director of Community <br /> Development before the first framing or structural inspection by the Building and Safety Division. <br /> The height of the structures shall be surveyed and verified as being in substantial conformance <br /> to the approved building heights as shown on Exhibit B or as otherwise conditioned. Any <br /> proposed modifications shall be subject to review and approval by the Planning Division. <br /> 23. FINAL INSPECTION: Final inspection by the Planning Division is required prior to occupancy. <br /> 24. TRANSFORMERS: New electrical transformers shall be placed underground, or aboveground <br /> and screened from view to the satisfaction of the Director of Community Development. Details <br /> of the new electrical transformers, and any screening architecturally compatible with the <br /> building, shall be included in the building permit submittal and shall be subject to the review and <br /> approval of the Director of Engineering/City Engineer and Director of Community Development <br /> prior to building permit issuance. <br /> P18-0340 Planning Commission <br /> Page 4 of 20 <br /> <br />or the rented units. (PROJECT <br /> SPECIFIC CONDITION) <br /> P18-0109 Planning Commission <br /> Page 4 of 13 <br />