Laserfiche WebLink
Attachment 1- Proposal Price Comparison Worksheet <br /> Womack Striping Chrisp Company Tri-Valley Striping <br /> Estimate 1-Iron Horse Trail $ 14,303,25 N/A $ 21,228.22 <br /> Estimate 2-Willow at Gibraltar $ 1,349.00 N/A $ 4,580.00 <br /> Estimate 3-Boulder at Quarry $ 7,995.90 N/A $ 16,674.75 <br /> Total $ 23,648.15 * $ 42,482.97 <br /> Item quantity rate total rate total rate total <br /> Install 30"R1-1 1 Each 225 <br /> on new post $ 225.00 495 $ 495.00 300 $ 300.00 <br /> Install 30"R1-1 1 Each 100 <br /> on existing post $ 100.00 185 $ 185.00 150 $ 150.00 <br /> Install 36"R1-1 1 Each 100 <br /> on existing post $ 100.00 225 $ 225.00 225 $ 225.00 <br /> Install 36"X 48" 1 Each 150 <br /> R2-1 on existing <br /> post <br /> $ 150.00 285 $ 285.00 275 $ 275.00 <br /> Install 30"FYG 1 Each 275 <br /> W11-2 and 24"x <br /> 12"FYG W16-7P <br /> on new post <br /> $ 275.00 525 $ 525.00 425 $ 425.00 <br /> Install 12"x 18" 1 Each 100 <br /> R26A on existing <br /> post $ 100.00 115 $ 115.00 85 $ 85.00 <br /> Remove 12"x 18" 1 Each 225 <br /> R26A and post <br /> $ 225.00 100 $ 100.00 90 $ 90.00 <br /> Remove 12"x 18" 1 Each 100 <br /> R26A and leave <br /> post $ 100.00 65 $ 65.00 60 $ 60.00 <br /> Install 12"x 8" 1 Each 100 <br /> R81 and 12"x 5" <br /> R81B on existing <br /> post $ 100.00 125 $ 125.00 175 $ 175.00 <br /> Install 30"R1-1 1 Each 100 <br /> on existing post <br /> (sign post <br /> extension needed) <br /> $ 100.00 185 $ 185.00 220 $ 220.00 <br /> Install 30"R1-1 1 Each 100 <br /> on street light pole <br /> $ 100.00 10 $ 185.00 125 $ 125.00 <br /> Install Detail 22 75 LF 1.4 <br /> $ 105.00 10 $ 750.00 4 $ 300.00 <br /> 1 of 2 <br />