My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
061819
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2019 8:53:30 AM
Creation date
6/12/2019 8:53:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item quantity rate total rate total rate total <br /> Install 12"white 6 LF 2.25 <br /> limit <br /> line/crosswalk line <br /> $ 13.50 8 $ 48.00 5 $ 30.00 <br /> Install"STOP" 1 Each 100 <br /> legend $ 100.00 180 $ 180.00 240 $ 240.00 <br /> Install"STOP 1 Each 225 <br /> AHEAD" legend $ 225.00 420 $ 420.00 540 $ 540.00 <br /> Install Detail 38 75 LF 1.4 $ 105.00 5.5 $ 412.50 2.5 $ 187.50 <br /> Install type IV 1 Each 50 <br /> arrow $ 50.00 120 $ 120.00 125 $ 125.00 <br /> Grind centerline 75 LF 1 <br /> (detail 22 or 23) $ 75.00 4 $ 300.00 2.5 $ 187.50 <br /> Grind lane line 75 LF 1 $ 75.00 4 $ 300.00 1.5 $ 112.50 <br /> Grind type IV 1 Each 50 <br /> arrow $ 50.00 100 $ 100.00 75 $ 75.00 <br /> Remove sign but 1 Each 75 <br /> leave post $ 75.00 65 $ 65.00 50 $ 50.00 <br /> Remove sign post 1 Each 100 <br /> from dirt $ 100.00 95 $ 95.00 100 $ 100.00 <br /> Remove sign post 1 Each 100 <br /> from concrete <br /> $ 100.00 145 $ 145.00 175 $ 175.00 <br /> Install"25" 1 Each 50 <br /> pavement legend $ 50.00 140 $ 140.00 150 $ 150.00 <br /> Install 30"W3-3 1 Each 100 <br /> on existing post <br /> $ 100.00 185 $ 185.00 150 $ 150.00 <br /> Install Streetbond 1 SF 3.75 <br /> Celtic Green bike <br /> lane(2 coats) <br /> $ 3.75 10 $ 10.00 7.14 $ 7.14 <br /> Install Streetbond 1 SF 5 <br /> Celtic Green bike <br /> lane(2 coats) <br /> $ 5.00 12 $ 12.00 10.24 $ 10.24 <br /> Total $ 2,807.25 $ 5,822.50 $ 4,569.88 <br /> Mobilization 1 EA 500 $ 500.00 shift 1550 EA 150 <br /> Traffic Control 1 EA 0 $ - day 1950 EA 1080 <br /> Cat-Tracking 1 EA 0 $ day 3600 EA 650 <br /> USA for new EA 0 <br /> posts 1 $ - shift 635 EA 100 <br /> Night Work 1 EA 1000 $ 1,000.00 shift 720 EA 1000 <br /> Mobilization- <br /> thermo or <br /> Streetbond EA 1000 <br /> Traffic Control- <br /> subcontracted EA 2000 <br /> Total $ 1,500.00 $ 8,455.00 $ 3,980.00 <br /> *Chrisp did not provide quotes for jobs as asked,only filled out price sheet. <br /> 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.