Laserfiche WebLink
STREET NAME BEGIN LOCATION END LOCATION AREA <br /> INGLEWOOD DR HOPYARD RD DENKER DR 44118 <br /> BEECH CT DENKER DR END 13333 <br /> BENNER CT DENKER DR END 15544 <br /> EVELYN CT DENKER DR END 8511 <br /> FISHER CT DENKER DR END 16237 <br /> HERRIN WAY ALVORD WAY MASON STREET 17464 <br /> MISSION DR SONOMA DR JUNIPERO DR 47229 <br /> SAN ANTONIO ST JUNIPERO DR END 59906 <br /> SAN JUAN WAY SAN CARLOS WAY SONOMA DR 68838 <br /> SAN JOSE DR SAN ANTONIO ST HOPKINS WAY 45672 <br /> SAN MIGUEL CT SAN JOSE DR END 11388 <br /> JUNIPERO ST INDEPENDENCE DR SONOMA DR 84360 <br /> SAN CARLOS WAY SONOMA DR END 32600 <br /> SAN LUIS CT SONOMA DR END 17432 <br /> FOOTHILL RD WEST LAS POSITAS BLVD 320'S/O MUIRWOOD DR 135400 <br /> (SOUTH) <br /> FOOTHILL RD HIGHLAND OAKS DR WEST LAS POSITAS BLVD 76636 <br /> FOOTHILL RD MUIRWOOD DR(NORTH) HIGHLAND OAKS DR 118272 <br /> SUNOL BLVD 1-680 VALLEY/JUNIPERO 207060 <br /> VINEYARD AVE BERNAL AVE EL CAPITAN DR 216720 <br /> VINEYARD AVE EL CAPITAN 130FT E/O LEONA PLACE 58330 <br /> The project also includes the widening of Foothill Road to accommodate a future <br /> buffered drop-off zone at Foothill High School, and the resurfacing of the existing <br /> transportation corridor parking lot between Abbie Street and Angela Street. The <br /> resurfacing of the parking lot was added to the project to capture the cost savings from <br /> economies of scale. <br /> Bids <br /> Sealed bids for this project were opened on May 14, 2019. There were five bids <br /> received, ranging between the low bid amount of $3,626,419 to $4,127,127. The low bid <br /> amount is approximately 7 percent higher than the engineer's estimate of $3,399,146. <br /> Past work performed by Granite Construction Company was verified to be satisfactory. <br /> Staff recommends award of the construction contract to the lowest responsible bidder, <br /> Granite Construction Company, Inc., for $3,626,419. <br /> Consultant Services: <br /> Consulting testing services for $20,000 will be provided under the existing on-call <br /> materials testing contracts. The testing services are required to provide specialty testing <br /> of the materials and density checks in conformance with the City's Quality Assurance <br /> Program for paving. <br /> Swinerton Management and Consulting, Inc. will be providing construction inspection <br /> services on an as-needed basis under the existing on-call construction management <br /> contract. Staff recommends authorizing a task authorization of $65,000 to cover the <br /> anticipated services required during the project. The use of consultant services on this <br /> Page 4 of 5 <br />