Laserfiche WebLink
• Program 2.7: "Require feasible mitigation measures to keep intersections impacted <br /> by development to acceptable service levels, in the event that LOS D is exceeded. <br /> If there are no feasible mitigation measures and if the intersections are otherwise <br /> not exempt from the LOS D standard, withhold development approvals, including <br /> building permits, until the intersections exceeding LOS D are at an acceptable level <br /> of service." <br /> Traffic Level-Of-Service Impacts/Mitigation Measures <br /> The traffic impacts and mitigation measures for the Stoneridge Mall development were <br /> identified in the Development Agreement. Traffic resulting from the total permitted floor area <br /> within the Development Agreement has been factored into the City's Baseline Traffic Reports <br /> and into the level-of-service (LOS) analyses for the City's most recently updated General Plan. <br /> Traffic improvements called out in the Development Agreement have been completed. The <br /> proposed net increase of 79,269 square feet falls within the allowable 380,000 square feet of <br /> retail assumed within the General Plan for Stoneridge Mall. Although the proposed increase is <br /> within the allowable development area, a Traffic Impact Analysis (TIA), included within <br /> Exhibit B, was nonetheless completed for the project. A supplemental parking analysis was <br /> also prepared which looked at parking for the overall mall as well as the new anticipated uses. <br /> The analyses were conducted for the purpose of verifying that there are no new on- or off-site <br /> traffic/circulation or parking impacts that were not identified within previous traffic and <br /> environmental analyses. The potential impacts of the project were evaluated in accordance <br /> with the standards set forth by the City of Pleasanton. <br /> Off-site Traffic Impacts <br /> As part of the TIA, four intersections (both for public streets and for internal streets/driveways <br /> on the mall's private property) were evaluated, as identified below. A map of the intersections <br /> can be found in Attachment A of the TIA within Exhibit B. <br /> 1. Stoneridge Mall Road and Embarcadero Court <br /> 2. Stoneridge Mall Road and Southeast Project Driveway <br /> 3. Stoneridge Mall Road and South Driveway near Springdale Avenue <br /> 4. Stoneridge Mall Road and Springdale Avenue <br /> Overall, the study concluded the project as proposed would have no significant level of service <br /> impacts at the study intersections under near-term or buildout conditions with or without the <br /> project. The applicant would be required to pay City and regional Traffic Impact Fees (TIF), <br /> which are structured to reflect the costs of intersection improvements needed to accommodate <br /> current and projected traffic volumes, including that generated by development under the <br /> existing Development Agreement. <br /> On-site Access and Circulation <br /> The TIA evaluated the site access and on-site circulation for the proposed project with access <br /> to the site provided via two main drive aisles on Stoneridge Mall Road, reduced down from <br /> nine. Based on the Traffic Analysis and observations of existing peak-hour operations, there is <br /> sufficient capacity and circulation within the proposed parking lot to accommodate the queues, <br /> and safety would not be affected if the queue extended past an adjacent drive aisle <br /> intersection. <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 13 of 17 <br />hopping Center Planning Commission <br /> 12 of 17 <br />erim, the <br /> applicant will leave the existing Stoneridge Mall Road street section as-is and create an interim <br /> 20-foot landscape area between the existing curb and the new sidewalk as shown in Figure 5. <br /> The applicant will be required to dedicate the land or provide public easements over the land in <br /> the future, when the additional Stoneridge Mall Road improvements move forward. The new <br /> pedestrian sidewalk and planter strip along the inner part of Stoneridge Mall Road would serve <br /> as the protype for all future development within the inner loop of the Mall creating greater <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 8 of 17 <br />