Laserfiche WebLink
Pedestrian/Bicycle Facilities <br /> The project will provide pedestrian sidewalks and linkages with seating throughout the <br /> development and to off-site areas, including the adjacent parking fields to the north and south. <br /> Bicycle racks and lockers have also been conditioned to be provided throughout the project to <br /> be located near each building within the project. <br /> In conclusion, the Traffic Analysis concluded that the project as proposed would be consistent <br /> with the prior traffic analysis results that have been completed for the approved Stoneridge <br /> Mall growth, and no new traffic impacts would be generated as a result of the proposed <br /> development. <br /> Parking <br /> The project would result in a total of 5,526 parking spaces for the entire Stoneridge Mall, a <br /> reduction of 1,104 spaces from what currently exists. The applicant has prepared a detailed <br /> parking study comparing the required parking required under the approved development <br /> agreement, the required parking per the PMC, and the proposed provided parking. A summary <br /> of the analysis is outlined in Tables 2 and 3. <br /> Table 2: Parking Required per Develo ment Agreement <br /> Use Proposed Square Parking Parking Required <br /> Footage Ratio <br /> Department <br /> Stores/Mall <br /> Stores, 1,257,685 4.5/1,000 5,660 <br /> Restaurants, <br /> Grocery2 <br /> Cinema 39'699 1/6 seats 167 <br /> (1,000 seats) <br /> Fitness3 123,750 1/300 413 <br /> Total 1,421,134 1/227 6,240 <br /> Table 3: Parking Required per Pleasanton Municipal Code <br /> Use Proposed Square Parking Parking Required <br /> Footage Ratio <br /> Retail Stores 1,178,971 1/300 3,930 <br /> Restaurants 55,845 1/200 279 <br /> Grocery 22,869 1/150 152 <br /> Cinema 39'699 1/6 seats 167 <br /> (1,000 seats) <br /> Fitness3 123,750 1/300 413 <br /> Total 1,421,134 1/290 4,941 <br /> 2 After reviewing previous approvals for PF Chang's and the Cheesecake Factory, it was determined that the City had <br /> previously calculated all restaurants and internal stores at the Mall at a 4.5/1000 parking ratio in accordance with the DA and <br /> calculated stand-alone specialty uses such as a cinema or fitness facility at a rate consistent with the PMC or other rate <br /> determined on a case-by-case basis. This is slightly different than shown at the PC Workshop,but consistent with previous <br /> Design Review approvals. <br /> 3 Per the PMC,parking requirements may be established by the Planning Commission on a case-by-case basis for uses not <br /> listed in the PMC.Per the submitted Parking Analysis,staff is recommending a parking ratio of 1/300. <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 14 of 17 <br />opment under the <br /> existing Development Agreement. <br /> On-site Access and Circulation <br /> The TIA evaluated the site access and on-site circulation for the proposed project with access <br /> to the site provided via two main drive aisles on Stoneridge Mall Road, reduced down from <br /> nine. Based on the Traffic Analysis and observations of existing peak-hour operations, there is <br /> sufficient capacity and circulation within the proposed parking lot to accommodate the queues, <br /> and safety would not be affected if the queue extended past an adjacent drive aisle <br /> intersection. <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 13 of 17 <br />hopping Center Planning Commission <br /> 12 of 17 <br />erim, the <br /> applicant will leave the existing Stoneridge Mall Road street section as-is and create an interim <br /> 20-foot landscape area between the existing curb and the new sidewalk as shown in Figure 5. <br /> The applicant will be required to dedicate the land or provide public easements over the land in <br /> the future, when the additional Stoneridge Mall Road improvements move forward. The new <br /> pedestrian sidewalk and planter strip along the inner part of Stoneridge Mall Road would serve <br /> as the protype for all future development within the inner loop of the Mall creating greater <br /> P18-0340, Stoneridge Shopping Center Planning Commission <br /> 8 of 17 <br />