My WebLink
|
Help
|
About
|
Sign Out
PC 022719
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2019
>
PC 022719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:05:46 PM
Creation date
4/11/2019 1:16:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
2/27/2019
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commissioner Ritter referred to Figure 2 which talks about housing opportunities and parking <br /> and asked if the Commission was looking at the entire property, not just a portion of this <br /> project. <br /> Ms. Hagen said there are no current applications for the remainder of the site, but any future <br /> application will be reviewed comprehensively with the entire mall, and Simon Properties is <br /> aware of the need to look at the overall development for the entire mall property. <br /> Commissioner Brown said the reason he asked about the one in six (1:6) ratio was because <br /> there are 1,000 cinema seats proposed and a 1,000-seat buffer. If going with a one to five (1:5) <br /> ratio, it would consume all the available buffering for the fitness center. <br /> Chuck Davis, representing the applicant Simon Properties, discussed the proposal, citing the <br /> need for gathering spaces, entertainment and dining uses and a comprehensive fitness facility, <br /> given nearby offices desire something more than just shopping. He spoke about an extension <br /> of the Development Agreement and the language contained therein, and that in moving <br /> forward they will provide a substantial renovation commitment to both the interior and exterior. <br /> Regarding parking, the ratios were set in 1992, which is outdated; he stated they are <br /> comfortable following the municipal code's requirements while considering peak uses. Lastly, <br /> the Climate Action Plan encourages parking reduction strategies and they think using the <br /> City's ratio is appropriate. <br /> Matt Klinzing, Simon Properties, gave a brief PowerPoint presentation and described the site <br /> plan, proposed uses, circulation and their work to create a pedestrian zone on the outer ring <br /> road, aerial views, greenery and concrete spaces, materials and public amenities. <br /> Commissioner Ritter asked if Simon's representatives have been in contact with the other <br /> owners. <br /> Mr. Davis said this project does not have anything to do with development on the balance of <br /> the site, and that there are two housing opportunity sites designated on the site while <br /> everything else is commercial. He said whatever is proposed in the future will have to ensure it <br /> is self-parked using parking decks. In terms of communications, they are focused on this first <br /> piece. <br /> Commissioner O'Connor said he saw the percentages of ownership for the property as well <br /> and asked if Simon Properties owns all the commercial space. <br /> Mr. Davis said JC Penney, Macy's and Nordstrom all own their own buildings and their section <br /> of parking; Simon Properties owns everything else. The two housing opportunity sites adopted <br /> in the Housing Element in 2015 are both on Simon-owned tracts. <br /> Chair Allen asked if this would be intended for housing in the future. <br /> Mr. Davis said they have a multi-family housing group within Simon Properties where they are <br /> developing housing. They are looking at the planning aspect of the housing opportunity sites <br /> but are also sensitive to what's happening within the City, given the next Regional Housing <br /> Need Assessment (RHNA) cycle coming up in 2022 and considering the aggressiveness of the <br /> Planning Commission Minutes Page 7 of 18 February 27, 2019 <br />irector of Community Development if found to be in substantial <br /> decibels] at any <br /> point outside of the property plane, unless otherwise provided in this chapter." <br /> According to the PMC, "noise level" means the maximum continuous sound level or <br /> repetitive peak level produced by a source or group of sources as measured with a <br />subject to review and <br /> approval by the City Landscape Architect prior to building permit issuance. <br /> P18-0269 Planning Commission <br /> Page 10 of 10 <br /> Page 6 of 10 <br />ake place underneath <br /> or within 5-feet of the dripline of the existing trees. <br /> PUD-131 Planning Commission <br /> Page 12 of 13 <br /> of a demolition permit, or the first building permit, whichever <br /> PUD-131 Planning Commission <br /> Page 5 of 13 <br />