My WebLink
|
Help
|
About
|
Sign Out
PC-2019-02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2019 10:09:32 AM
Creation date
4/11/2019 10:07:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/20/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-02
NOTES
P19-0027, SMALL WIRELESS FACILITIES ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the applicant must submit a written authorization from the support structure <br /> owner(s). <br /> (12) Acoustic Analysis. The applicant shall submit an acoustic analysis prepared <br /> and certified by an engineer licensed by the State of California for the proposed <br /> small wireless facility and all associated equipment including all environmental <br /> control units, sump pumps, temporary backup power generators and <br /> permanent backup power generators demonstrating compliance with the City's <br /> noise regulations. The acoustic analysis must also include an analysis of the <br /> manufacturers' specifications for all noise-emitting equipment and a depiction <br /> of the proposed equipment relative to all adjacent property lines. In lieu of an <br /> acoustic analysis, the applicant may submit evidence from the equipment <br /> manufacturer(s) that the ambient noise emitted from all the proposed <br /> equipment will not, both individually and cumulatively, exceed the applicable <br /> noise limits. <br /> (b) Additional Requirements. The City Council authorizes the Community <br /> Development Director to develop, publish and from time to time update or amend <br /> permit application requirements, forms, checklists, guidelines, informational <br /> handouts and other related materials that the Community Development Director <br /> finds necessary, appropriate or useful for processing any application governed <br /> under this Policy. All such requirements and materials must be in written form and <br /> publicly available to all interested parties. <br /> SECTION 2.3. SMALL CELL PERMIT APPLICATION SUBMITTAL AND <br /> COMPLETENESS REVIEW <br /> (a) Requirements for a Duly Filed Application. Any application for a small cell <br /> permit will not be considered duly filed unless submitted in accordance with the <br /> requirements in this . <br /> (1) Submittal Appointment. All applications must be submitted to the City at a <br /> pre-scheduled appointment with the Community Development Director. <br /> Potential applicants may generally submit one application per appointment, or <br /> up to five individual applications per appointment for batched applications as <br /> provided in tk',. Potential applicants may schedule successive <br /> appointments for multiple applications whenever feasible and not prejudicial to <br /> other applicants for any other development project. The Community <br /> Development Director shall use reasonable efforts to offer an appointment <br /> within five working days after the Community Development Director receives a <br /> written request from a potential applicant. Any purported application received <br /> without an appointment, whether delivered in-person, by mail or through any <br /> other means, will not be considered duly filed, whether the City retains, returns <br /> or destroys the materials received. <br /> {00032392;5} page 8/28 <br /> identified in the title report that authorizes the applicant to submit and accept a <br /> small cell permit in connection with the subject property. For any small wireless <br /> facility proposed to be installed on a support structure in the public right-of-way, <br /> {00032392;5} page 7 /28 <br />s as a "small wireless facility" as defined by the FCC in <br /> 47 C.F.R. § 1.6002(/). A complete written narrative analysis will state the <br /> applicable standard and all the facts that allow the City to conclude the standard <br /> has been met—bare conclusions not factually supported do not constitute a <br /> {00032392;5} page 6/28 <br />le report(s), adjoining deeds, and underlying <br /> recorded maps to the Director of Engineering/City Engineer, prior to submittal of the first plan <br /> Vesting Tentative Map 8483 Planning Commission <br /> Page 4 of 5 <br />