My WebLink
|
Help
|
About
|
Sign Out
PC-2019-02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2019 10:09:32 AM
Creation date
4/11/2019 10:07:27 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/20/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-02
NOTES
P19-0027, SMALL WIRELESS FACILITIES ORDINANCE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
complete written analysis. As part of the written statement the applicant must <br /> also include (i) whether and why the proposed support is a "structure" as <br /> defined by the FCC in 47 C.F.R. § 1.6002(m); and (ii) whether and why the <br /> proposed wireless facilit meets each required finding for a small cell permit as <br /> provided in ,"/"' <br /> (7) RF Compliance Report. The applicant shall submit an RF exposure <br /> compliance report that certifies that the proposed small wireless facility, as well <br /> as any collocated wireless facilities, will comply with applicable federal RF <br /> exposure standards and exposure limits. The RF report must be prepared and <br /> certified by an RF engineer acceptable to the City. The RF report must include <br /> the actual frequency and power levels (in watts effective radiated power) for all <br /> existing and proposed antennas at the site and exhibits that show the location <br /> and orientation of all transmitting antennas and the boundaries of areas with <br /> RF exposures in excess of the uncontrolled/general population limit (as that <br /> term is defined by the FCC) and also the boundaries of areas with RF <br /> exposures in excess of the controlled/occupational limit (as that term is defined <br /> by the FCC). Each such boundary shall be clearly marked and identified for <br /> every transmitting antenna at the project site. <br /> (8) Public Notices. The applicant shall reimburse the City for the cost of preparing <br /> and mailing public notices. <br /> (9) Regulatory Authorization. The applicant shall submit evidence of the <br /> applicant's regulatory status under federal and California law to provide the <br /> services and construct the small wireless facility proposed in the application. <br /> (10) Pole License Agreement. For any small wireless facility proposed to be <br /> installed on any structure owned or controlled by the City and located within the <br /> public rights-of-way, the applicant shall submit an executed Pole License <br /> Agreement on a form prepared by the City that states the terms and conditions <br /> for such non-exclusive use by the applicant. No changes shall be permitted to <br /> the City's Pole License Agreement except as may be indicated on the form <br /> itself. Any unpermitted changes to the City's Agreement shall be deemed a <br /> basis to deem the application incomplete. Refusal to accept the terms and <br /> conditions in the City's Agreement shall be an independently sufficient basis to <br /> deny the application. <br /> (11) Title Report and Property Owner's Authorization. For any small wireless <br /> facility proposed to be installed on any private property not owned or controlled <br /> by the City, the applicant must submit: (i) a title report issued within 30 days <br /> from the date the applicant filed the application; and (ii) if the applicant is not <br /> the property owner, a written authorization signed by the property owner <br /> identified in the title report that authorizes the applicant to submit and accept a <br /> small cell permit in connection with the subject property. For any small wireless <br /> facility proposed to be installed on a support structure in the public right-of-way, <br /> {00032392;5} page 7 /28 <br />s as a "small wireless facility" as defined by the FCC in <br /> 47 C.F.R. § 1.6002(/). A complete written narrative analysis will state the <br /> applicable standard and all the facts that allow the City to conclude the standard <br /> has been met—bare conclusions not factually supported do not constitute a <br /> {00032392;5} page 6/28 <br />le report(s), adjoining deeds, and underlying <br /> recorded maps to the Director of Engineering/City Engineer, prior to submittal of the first plan <br /> Vesting Tentative Map 8483 Planning Commission <br /> Page 4 of 5 <br />