Laserfiche WebLink
❖ The concept design was presented to the Parks and Recreation Commission on March 14, <br />2019. <br />❖ City Council prioritized the transportation corridor on March 19, 2019 when Council adopted <br />their two year work plan. <br />MISCELLANOUS PARK PROJECTS <br />The following is a list of small projects that fall into the categories of "routine replacement," <br />"minor renovation" or "public art installation." <br />Minor Renovation: <br />Playground Renovation <br />Consistent with the City's ongoing playground replacement plan, theCity is replacing the <br />playground at Hansen Park (five -to -twelve -year-old play area) and the big hillside slide at <br />Mission Hills Park. The City sent out an RFQ on July 24 for design and construction services <br />and received three qualified proposals on August 16. Based on the proposals the City chose <br />Miracle Playsystems for Mission Hills Park and SPEC for Hansen Park. <br />❖ Public outreach was held at Hansen Park for the playground renovation on October 27, <br />2018. <br />❖ The Hansen Park playground design was revised to incorporate comments received during <br />the public outreach process and presented to the Parks and Recreation Commission on <br />November 8, 2018 for a recommendation. The Commission recommended approval of the <br />revised design. <br />On December 5, 2018 the City approved a purchase order with SPEC for the fabrication and <br />installation of the playground. <br />❖ Public outreach was held at Mission Hills Park for the big slide renovation on December 15, <br />2018. <br />On January 10, 2019 City Staff presented the Mission Hills slide concept plans and public_ <br />comments to the Parks and Recreation Commission fora recommendation. The <br />Commission recommended moving forward with the design and installation of Option 2. <br />The City contracted with Miracle Playsystems for the design of construction documents for <br />the Mission Hills slide renovation on January 31, 2019. <br />❖ Installation of the Hansen Park playground began in mid-March and is scheduled to open by <br />mid-April. <br />Page 9 <br />