Laserfiche WebLink
M I G <br /> LWDP Ph II Proposal <br /> Summary Scope 11/26/18 <br /> 4. Presentation to PDA <br /> • 4.1 Presentation of the Preliminary Schematic Illustrative Plan (assume: 3'd week in May, 2019) <br /> to the Pleasanton Downtown Association. <br /> • 4.2 Meeting at City Hall with City Staff to review work to date and anticipated revisions to plan <br /> and 2014 Master Plan report <br /> o Includes review of comments to date <br /> o Includes outline of anticipated revisions to plan and report <br /> 5. Preparation of Preliminary Master Plan <br /> • 5.1 Preparation of revisions, incorporating all comments to date <br /> • 5.2 Phone Meeting with City Staff for draft review of progress work to date <br /> • 5.3 Continue preparation of Master Plan Report and Preliminary Illustrative Plan <br /> • 5.4 Presentation (4)to Parks & Recreation Commission (8/8/19) of final Preliminary Illustrative <br /> Plan and Master Plan Report <br /> 6. Presentation of Master Plan <br /> • 6.1 Presentation (1)to City Council (9/20/19)of Final Master Plan (report and illustrative plan) <br /> • 6.2 Meeting at City Hall with City Staff—includes: <br /> o Review of final comments and revisions to Master Plan <br /> o Discussion of anticipated next steps (subsequent phases) <br /> • 6.3 Preparation of final revisions to Master Plan <br /> o Includes delivery of electronic version of Master Plan to City <br /> Note: Fees and scope are based on the assumptions, meeting dates, and items described in this scope, <br /> and the accompanying Project Schedule. <br /> Scope revisions,additional work, and changes in the schedule will be invoiced as additional services, at a <br /> time& materials rate, contingent upon approval by City of Pleasanton. <br /> PLANNING I DESIGN I C O M M U N I C A T I O N S I M A N A G E M E N T I S C I E N C E TECHNOLOGY <br /> 800 Hearst Avenue • Berkeley, CA 94710 • USA • 510-845-7549 • www.migcom.com <br /> Offices in California • Colorado • New York • Oregon • Texas • Washington <br />