Laserfiche WebLink
MIG,Inc. <br /> Landscape Architectural Services Project Schedule <br /> Lions Wayside 8 DeLucchi Parks-Ph II <br /> City of Pleasanton 2018 2019 <br /> Nov Dec Jan Fab Mae Ape May Jun Jul Aug Sep Oct <br /> 16123/30 7 14 21 28 4111115125 1 1 8 115122 l 1 8115122129 6112119126 3110117124131 7114121128 5112119126 219116123130 6113120127 4 11 18 25 1 8 15 22 29 6 13 20 27 <br /> 1 Project Initiation <br /> 11 w005ntmse.aetpnupdehneSttam-Rereowns tlooinMaosftperroPlactn-toI wlNy Roe rp tl o <br /> f Cowed <br /> ', Coo.hted 10/25/18 _■� <br /> 4 Preliminary Schematic Plan-P&R Commission <br /> 21,Presentation(1)to P6R Comm of the 3 versions of Pre-Schem plane selected by City ' <br /> 4 <br /> trendn110119h <br /> 1.Assumes Commission to choose 2 plans for devebpment <br /> 2.2!Phone MIS w/COY Staff.Consolidate Maul from P&R Commeson 6 CM Staff <br /> 23;Preparation of revisions to,&development of,two Prelim Schem Plans-based on <br /> ,input fr Commission&CM Staff.Assumes receipt of topo site survey. <br /> 2.4 1Pt..antation(2)to P6R Comm of 2 alernatre Prekm Schem Plana(2114119). <br /> IAssumes Commiuion to chose 1 plan for development <br /> 2.5!Phone Mtg w/City Staff Consolidate input from Comm'esion 6 City Staff <br /> 2.6!Preparation of preferred plan,to prepare preferred Prelim Schem Plan <br /> 3 Preliminary Schematic Illustrative Plan-RWQCB <br /> 3.1 151 Map 0th RWOCB to revew Prelim Schem Plan <br /> ]2 Preparaton of revisions to Prelim Schem Plan.based on input from RWOCB 6 City <br /> Stan <br /> .- <br /> 3.3 2nd Mtg well RWOCB to revew revised Rehm Schem Plan <br /> I <br /> 3.4 Mtp at City Hall with City Staff to consolidate and summarize all comments to date • <br /> ].5 Preparation of revisions. Buggions.to prepare Prelim Scheel Bugg -based on input from <br /> RWOCB.Cary Staff <br /> 3.6 Presentation(3)to P6R Comm of Prelim Schematic Nuel the Plan(519119) <br /> 3.7'.Phone Mt9 w/City Staff:Consolidate nput from RWOCB.C mmiss on&City Staff I — <br /> 4 Presentations to City Commissions <br /> I 41!Presentation of Prelim Schematic IOastr Plan-to PDA(assume third week in Map <br /> ;Mfg t City Hal with City Staff Review work to dere and revisions to plan,summary of <br /> 4.2 nlr tpated revisions to 2014 Master Plan report. Ili I I 1 <br /> 51!Preparation of revisions to incorporate al commends to dale 1 <br /> 52!Phone Mtg with City Staff to teuwo 0/00k to date ! <br /> 5.1 ICotinued preparation of plan and report i_— I , I ' <br /> } <br /> 5A!Presentation(4)to Ph&Recr Comm of Prelim Must Plan and Report(8/5119) ❑ <br /> 1-j t <br /> a1;Presentation(1)to City Council of Final Master Plan 1912 011 9 1 treport and 8ustrative • ' , <br /> !Plan). <br /> 6.2 1MM at CM Hall with City Staff-includescomments.last rewsons.&look ahead <br /> 6: Preparation of final revisions to Final lllustralma Plan 6 Report.Incl delivery o/ <br /> • <br /> -_ elactronio veeon to Cih <br /> a)See separate sheets fur scope and lees. <br /> b)Schedule assumes that delays that are not caused by consulting team will delay predicted <br /> schedule. <br /> P.1 of t 1220116 <br />