My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
090418
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2018 3:44:50 PM
Creation date
8/29/2018 3:44:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/4/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valley Link Alignment Options Under Consideration <br /> BART Connection Options <br /> CAPITAL COST <br /> OPTION OPTION CHARACTERISTICS (FY17) <br /> C <br /> O <br /> At-grade station with side platform allowing cross platform <br /> Existing Dublin/ <br /> Pleasanton BART Station BART transfers in the peak direction of travel. Realignment <br /> I of westbound 1-580 wih reduced inside shoulder width and $22 million <br /> E (At Grade Valley Link express lane buffer, and reduced lane and shoulder width <br /> 0 Station) <br /> 0 of Scarlett Court(subject to Caltrans/City approval). <br /> oc <br /> Existing Dublin/Pleasanton Aerial station above existing BART platform supported by <br /> BART Station (Aerial Valley $30 million <br /> columns in 1-580 shoulders. <br /> Link Station) <br /> Extension of BART to BART extended to Isabel as envisioned in the BART EIR. $1.3 billion* <br /> Isabel <br /> Isabel BART Station (Aerial Aerial station above Isabel Avenue and Isabel BART Station <br /> Valley Link Station) shown in the BART to Livermore Extension EIR. $46 million <br /> *BART EIR cost to extend BART to Isabel in FY16 dollars <br /> 1-580 Alignment and Profile <br /> • The Valley Link alignment would be in the median of 1-580 at-grade with the freeway. <br /> • Passing sidings would be located between freeway interchanges to minimize impacts of <br /> interchange structures. <br /> • 1-580 would be widened to maintain the existing lane configuration. <br /> 1-580 Alignment and Profile Options <br /> OPTION OPTION CHARACTERISTICS CAPITAL COST(FY17) <br /> c <br /> o <br /> as <br /> Valley Link at-grade with adjacent freeway traffic. <br /> o At-Grade Passing sidings between freeway interchanges. 1-580 $887 million <br /> Ewidening to maintain existing lane configuration. <br /> 0 <br /> ca <br /> a> <br /> ce <br /> Valley Link elevated above 1-580 median and above <br /> Aerial freeway interchanges. Double track system supported $1,244 million <br /> by columns in freeway median. <br /> Tri-Valley. San Joaquin Valley <br /> /'®� REGIONAL RAILJ <br /> AUTHORITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.