Laserfiche WebLink
Existing Pearn.Eligible for Explanation o/ Percent Pleasanton ,erten PIMfCnfOn <br /> a Roadway Inter-tertian/Segment Improvements Source Updated Description Ertimated Cost (0050cluded in TlF Program <br /> Deficiency? Fee Program Eligibility Trips,from Model Trips,Adjusted <br /> Constru,r secoi,d WB left-tu,n lane <br /> 16 Santa Rita Road Valay Avenue Construct 3rd SI left-turn liming to be Draft2010 TIF S2.000.ODO $2,000,000 No (02% 62000.Wt $2000,000 <br /> determined by City Council de <br /> under Report <br /> Praarem 23. <br /> Construct free westbound right tum lane. <br /> 17 Stanley Boulevard Valley Avenue/Bernal Avenue convert eastbound right tum only lane Orale 2010 lit 52500,000 52,500.000 No 100% .v, t W°a 51.500000 52.500000 <br /> into a through/right option lane,retain NB Report <br /> bee right turn lane <br /> 15 Stoneridge Drive 1-680 Overpass Widen WB overpass by 1 to 21anes Orale 2010 niP $8000,D60 510800,000 No 100% 90% 10096 18,000.000 512,600.000 <br /> Report <br /> Provide EB free rghl turn(maybe removeOrale 2010 TIF <br /> 19 Stoneridge Drrve Hopyard Road one SR through lane).Change cycle to 100 Report 670,000 1]]0000 No 100% 97% 100% 9770000 1770,000 <br /> sec Treated as existing <br /> Unvprt north/south phasing(safety Draft 2010 TIF deficiency,because <br /> 20 Stonendge Dove Springdale Avenue improvement) Report $70,000 570,000 Yes 17% project is prinnany 88% 100% 112040 512,040 <br /> safety-focused. <br /> Corvert a through lane for the <br /> northbound and southbound approaches Draft 2010 TIF <br /> 21 Stoneridge Drive W las Positas Boulevard to a left turn lane;resinpe WB and EB Report 850,000 550000 No 100% 100% 100% 150.000 850,000 <br /> lanes to add separate WB and E8 right <br /> turn lanes on Stoneridge <br /> Widen roadway In interchange area, <br /> signalize both ramp intersections at Sunol Draft 2010 TiF <br /> 22 Sunol Boulevard 1-6130 Interchange Boulevard.widen structure over Happy Report $6,000,000 56.000.000 No 100% 97% 100% 46,000,000 $6,000.000 <br /> Valley Road and provide a southbound <br /> acceleration lane from Sunol On-Ramp <br /> Expect 40%direct <br /> developer <br /> Sycamore Creek Way 200 ft east of Dimas Court to Construct as 2 lane street with bike lanes Draft 2010 TIF contribution,based <br /> 23 Extension WeslbrMe Lane antla Classlwalkinq trail Report 116,000.000 $16,000,000 No 60% on proportioiW 100% 100% 59,600,000 $9,600,000 <br /> usage from Spotorno <br /> trips <br /> Draft 2010 TIF 5820,000 5820.000 No 100% 98% 100% 1820000 $820000 <br /> 24 W Las PashBoulevard Hopyard Road Construct 3rd westbound left turn lane <br /> as <br /> Report <br /> Improve or malty each intersection and <br /> 25 W Las Podtas Westbound Owens Drive to Santa Rita westbound Wto improve circulation Draft2010 TIF $120.000 5120.000 No 100% 100% 100% 5120000 4120,000 <br /> through this stretch and improve Report <br /> operations at Santa Rita/West Los Positas <br /> 26 Park and Ride Lot - Park and Ride let at Ber al/I-686 Draft 2010 TIF <br /> Report $4.000,000 94.000.000 No 100% 100% 100% 14,000,000 54,000,000 <br /> 27 Embarcadero Court Embarcadero Court at two-way stop-Construct a roundabout Workday TIA 51,000,000 51.000,000 No 100% 100%, 100%, 51,000,000 11,000,000 <br /> controlled intersection <br /> vie,. nue.n,.e,u ung. <br /> Improvements(Phase 2)'.reconstruction of <br /> overcrossing to provide four-lanes in each <br /> direction wets bike lane,reconstruction of <br /> the southbound to eastbound loop on <br /> ramp;widening of the eastbound off- <br /> 28 El Charro Road I-580 interchange ramp to provide two exit lanes with two City $4,193,625 14,193.625 No 100% 77% 100% 54,193,625 $4,193,626 <br /> left turn and two nght tum lanes,; <br /> widening of the eastbound on-ramp, <br /> widening of the westbound off-ramp to <br /> provide two left tum and two right turn <br /> lanes;and widening of the westbound on- <br /> 29 Hacienda Ddve Hacienda Drive at I-610 Eastbound Modifysignal and striping to convert a2 General Plan 140,000 540,000 No 100% 04% 100% 140,000 140,000 <br /> OR-Ramp left turn lane to a kfl/nght option lane <br /> B-2 <br />