Existing Pearn.Eligible for Explanation o/ Percent Pleasanton ,erten PIMfCnfOn
<br /> a Roadway Inter-tertian/Segment Improvements Source Updated Description Ertimated Cost (0050cluded in TlF Program
<br /> Deficiency? Fee Program Eligibility Trips,from Model Trips,Adjusted
<br /> Constru,r secoi,d WB left-tu,n lane
<br /> 16 Santa Rita Road Valay Avenue Construct 3rd SI left-turn liming to be Draft2010 TIF S2.000.ODO $2,000,000 No (02% 62000.Wt $2000,000
<br /> determined by City Council de
<br /> under Report
<br /> Praarem 23.
<br /> Construct free westbound right tum lane.
<br /> 17 Stanley Boulevard Valley Avenue/Bernal Avenue convert eastbound right tum only lane Orale 2010 lit 52500,000 52,500.000 No 100% .v, t W°a 51.500000 52.500000
<br /> into a through/right option lane,retain NB Report
<br /> bee right turn lane
<br /> 15 Stoneridge Drive 1-680 Overpass Widen WB overpass by 1 to 21anes Orale 2010 niP $8000,D60 510800,000 No 100% 90% 10096 18,000.000 512,600.000
<br /> Report
<br /> Provide EB free rghl turn(maybe removeOrale 2010 TIF
<br /> 19 Stoneridge Drrve Hopyard Road one SR through lane).Change cycle to 100 Report 670,000 1]]0000 No 100% 97% 100% 9770000 1770,000
<br /> sec Treated as existing
<br /> Unvprt north/south phasing(safety Draft 2010 TIF deficiency,because
<br /> 20 Stonendge Dove Springdale Avenue improvement) Report $70,000 570,000 Yes 17% project is prinnany 88% 100% 112040 512,040
<br /> safety-focused.
<br /> Corvert a through lane for the
<br /> northbound and southbound approaches Draft 2010 TIF
<br /> 21 Stoneridge Drive W las Positas Boulevard to a left turn lane;resinpe WB and EB Report 850,000 550000 No 100% 100% 100% 150.000 850,000
<br /> lanes to add separate WB and E8 right
<br /> turn lanes on Stoneridge
<br /> Widen roadway In interchange area,
<br /> signalize both ramp intersections at Sunol Draft 2010 TiF
<br /> 22 Sunol Boulevard 1-6130 Interchange Boulevard.widen structure over Happy Report $6,000,000 56.000.000 No 100% 97% 100% 46,000,000 $6,000.000
<br /> Valley Road and provide a southbound
<br /> acceleration lane from Sunol On-Ramp
<br /> Expect 40%direct
<br /> developer
<br /> Sycamore Creek Way 200 ft east of Dimas Court to Construct as 2 lane street with bike lanes Draft 2010 TIF contribution,based
<br /> 23 Extension WeslbrMe Lane antla Classlwalkinq trail Report 116,000.000 $16,000,000 No 60% on proportioiW 100% 100% 59,600,000 $9,600,000
<br /> usage from Spotorno
<br /> trips
<br /> Draft 2010 TIF 5820,000 5820.000 No 100% 98% 100% 1820000 $820000
<br /> 24 W Las PashBoulevard Hopyard Road Construct 3rd westbound left turn lane
<br /> as
<br /> Report
<br /> Improve or malty each intersection and
<br /> 25 W Las Podtas Westbound Owens Drive to Santa Rita westbound Wto improve circulation Draft2010 TIF $120.000 5120.000 No 100% 100% 100% 5120000 4120,000
<br /> through this stretch and improve Report
<br /> operations at Santa Rita/West Los Positas
<br /> 26 Park and Ride Lot - Park and Ride let at Ber al/I-686 Draft 2010 TIF
<br /> Report $4.000,000 94.000.000 No 100% 100% 100% 14,000,000 54,000,000
<br /> 27 Embarcadero Court Embarcadero Court at two-way stop-Construct a roundabout Workday TIA 51,000,000 51.000,000 No 100% 100%, 100%, 51,000,000 11,000,000
<br /> controlled intersection
<br /> vie,. nue.n,.e,u ung.
<br /> Improvements(Phase 2)'.reconstruction of
<br /> overcrossing to provide four-lanes in each
<br /> direction wets bike lane,reconstruction of
<br /> the southbound to eastbound loop on
<br /> ramp;widening of the eastbound off-
<br /> 28 El Charro Road I-580 interchange ramp to provide two exit lanes with two City $4,193,625 14,193.625 No 100% 77% 100% 54,193,625 $4,193,626
<br /> left turn and two nght tum lanes,;
<br /> widening of the eastbound on-ramp,
<br /> widening of the westbound off-ramp to
<br /> provide two left tum and two right turn
<br /> lanes;and widening of the westbound on-
<br /> 29 Hacienda Ddve Hacienda Drive at I-610 Eastbound Modifysignal and striping to convert a2 General Plan 140,000 540,000 No 100% 04% 100% 140,000 140,000
<br /> OR-Ramp left turn lane to a kfl/nght option lane
<br /> B-2