Laserfiche WebLink
0 Roadway Interseon/Segment Improvements Source Updated Description Estimated Cost Existing Percent Eligible for Explanation of Percent Pleasanton Percent Pleosonn Con Included in TIF Progry <br /> Deficiency? Fee Program Eligibility Trips.from Madel Trips,Adjusted n <br /> cti <br /> Hopyard Riad at I-SBO Eastbound Molly signal to provide eastbound <br /> 30 Hopyard Road Ramp right/northbound through overlap period General Plan 330,000 530,000 No 100% 12% 100% 330,000 330.000 <br /> 31 Hopyard Road Hopyard Road at I-580 Westbound Re-stripe ole-ramp to convert a2 leftturn General Plan 320,000 620000 No 10096 56% 56% 111200 111,200 <br /> Off-Ramp lane into a left/right option lane <br /> 32 Stoneridge Drive Stoneridge Drive at 1-680 Maddy signal to allow a northbound Genial Plan 130000 330,000 No 100% 90% 100% 330,000 130000 <br /> Northbound right/westbound through overlap period <br /> 33 Valley Avenue Valley Avenue at Ko3 Center Parkway Un-spat east/west <br /> so., <br /> I <br /> North igna Phasing General Plan 340000 340,000 No 100% 100% 100% $40,000 140,000 <br /> r a n nu c....../..11w a4X ansa <br /> for at least 700 feet north of intersection <br /> to provide an additional northbound <br /> receiving lane and an additional <br /> southbound right turn lane,add an <br /> Johnson Drive <br /> 34 Johnson Drive al Stoneridge Drive additional southbound left tum lane, EDZ 57,000,000 57,000,000 No 100% 98% 10096 37,000,000 67000,000 <br /> extend the westbound right turn pocket <br /> 800 feet,convert the lane to a shared <br /> through-right lane,construct a second on- <br /> ramp lane to northbound 1-680,and add a <br /> 35 Sona dge Mall Road Stoneridge Mal Road at Stoneridge Extend the innermost southbound left Workd TIA <br /> 1100 <br /> Drive turn lane to MCWiRams Lane ay ,000 1100,000 No 100% 87% 100% 1100,000 1100000 <br /> Treated as existing <br /> Install flashing yellow arrows at up to 25 deficiency because <br /> 36 Various Locations traffic signalsCity 11,250,000 50500,000 Yes 17% project is primarily 100% 3215,000 1430,000 <br /> safety-focused. <br /> SUBTOTAL,Roadway Improvements $151,513,623 $141,713,625 5115,S51,114S $124,754,145 <br /> Note in**gonals <br /> 37 Bernal Avenue at Nevada Street Install new traffics I Draft 2010 TIF <br /> signal Report 3750.000 5750.000 No 100% 100% 100% 5750,000 5750,000 <br /> 38 - Bernal Avenue at Kottinger Drive Install new traffic signal Draft 2010 TIE $750,000 $750,000 No 100% 96% 100% 5750,000 0750,000 <br /> Report <br /> 39 - Bernal Avenue at Main Street Install new traffic signal Draft 2010 TIF 1750,000 1750,000 No 100% 96% 100% 3710000 3750,000 <br /> Report <br /> Draft 2010 TIF Expect 20%direct <br /> 40 - Busch Road at EI Charro Road Install new traffic signal 10 <br /> Report 3675,000 16750 No 80% developer 98% 100% 5540.000 3540,000 <br /> contribution <br /> Draft 203011E Expect 2096 direct <br /> 41 - El Charro Road at Stanley Boukvard Install new traffic signal Report 1675000 1675000 No 80% developer 99% 100% 6540000 3540000 <br /> contribution <br /> Highland Oaks Drive Install new traffic signalDraft 2010 TIF <br /> 42 - Foothill Road at Hi <br /> g Report 3675000 5675000 No 10096 100% 100% 5675,000 5675,000 <br /> 43 - Hopyard Road at Del Valle Parkway Install new traffic signal Drape 010[TIF 1750,000 5750000 No 100% 89% 100% 3750,000 $750,000 <br /> Main Street at St Mary Street/Spring Install traffics I Draft 201011F <br /> Street44 , signal <br /> Report 11,000,000 11,000,000 No 100% 96% 100% 51,000,000 31,00,000 <br /> 45 ciu <br /> Santa Rita Road at Frano Street Install new traffics Draft 2010 TIF <br /> g^aI Report 5675,000 3675.000 No 100% 100% 100% 5675,000 3675,000 <br /> 40 Santa Rita Road at Sutterrag 2010 TIE <br /> er tate Install new tragic signal 1675,000 $675,000 No 100% 100% 100% 3675000 6675000 <br /> Avenue Report <br /> 47 - Stoner. Mall Road at Deodar WayInstall new trafficDraft 2010 TIF 3675000 <br /> Stoneridge signal Report 16]5.000 5615,000 No 100% 10096 100% 5675,000 <br /> Stoneridge Mall Road at West BART Draft 2010 TIF <br /> Install new traffic signal 3675,000 5675000 No 100% 54% 54% 3364,500 3364,500 <br /> Station Driveway Report <br /> 49 ValleyAvenue at Blackbird Drive Install new trafficDraft 2010 TIF <br /> signalReport 5150,000 6750,000 No 100% 100% 100% 5750,000 3750.000 <br /> 50 - Valley Avenue at Hansen Drive Install new traffic signal Draft 2010 TIF 3750.000 1750,000 No 100% 100% 100% $750,000 3750,000 <br /> Report <br /> 8-3 <br />