Laserfiche WebLink
TABLE 1:Pleasanton TIF Nexus Analysis <br /> Roadway Intersection/S.6.w. fnprovemmhi ' .,. Source Updated Description , Estimated Cost .y a hTtenf v Cost Included in TIF Program <br /> `FiSN(ng Plieakmf a3 <br /> Deficiency? Fee Program Eligibility i ips,from Madel Trips,Adjusted <br /> Low High Minimum Maximum <br /> Roadway Irnp,oeemenrs <br /> Construe;a new badge to the south of <br /> the vesting bridge to provide new bike Draft 2010 TIF <br /> 1 Bernal Avenue 1-680 to East of Foothill lane and Iwo eastbound travel lanes. 55.000,000 $3,000,001' - 100% 100% 45,000,000 55,000,000 <br /> Existing bridge will ho comerled to Report <br /> westbound"directwn onto <br /> Widen to 6 lanes;at the intersection of <br /> Valley Avenue,convert the westbound <br /> right tum only lane into a through/right Draft 2010 TIF <br /> 2 Bernal Avenue H6B0 to Valley Avenue option lane;convertthe SBR only lane to 51.000,000 51,000.000 No 100% 96% 100% 31,000,000 51,000,000 <br /> Report <br /> a channelued tree right tum lane and <br /> convert the SB shared through/right lane <br /> to an exrhicnm SRT lane <br /> Add southbound right Wm lane an Old Draft 2010 TIF <br /> 3 Bernal Avenue Case Avenue/Old Bernal Avenue Bernal Avenue Report 0500000 0500000 No 100% 96% 100% 5500,000 5500,000 <br /> Construct as 4lane divided with Class I &pest 20%direct <br /> East of Ironwood Drive to EI Charro Draft 2010 TIF <br /> 4 Busch Road Road bike facility along south side or Class IV Re rt 58,400,000 58,400.000 No BO% developer 100% 100% 56,720,000 56,720,000 <br /> bike facilities contribution <br /> Construct as 4lane divided with Class I Expect 50%direct <br /> Stoneridge Drive to Stanley Draft 2010 TIF <br /> 5 El Charro Road Boulevard bike faolity along west side or Class IV Report 553,560,000 553,560,000 No 50% developer 99% 100% 126780,000 524780,000 <br /> bike facilities contribution <br /> 6 First Street Vineyard Avenue/Ray Street Corvert east/went to Draft 2010 TIF 570.000 570000 No 100% 97% 100% 510,000 170,000 <br /> protected/penneswe left turn phasing Report <br /> Add 2nd WBL lane on Bernal and extend <br /> Draft 2010 DF <br /> 7 First Street/Sunol Boulevard Bernal Avenue 2nd SET lane on First Street/Sunol Report 51,100,000 51,100,000 No 100% 97% 100% 51,100,000 51,100,000 <br /> Boulevard:include bike lanes <br /> W idewrestnpe to 4 northbound lanes and 0raft 2010 TIF <br /> 8 Foothill Road 1-580 to Stoneridge Drive 3southbound lanes divided with bike Report 19800000 514,000.000 No 100% 7T% 100% 59,800,000 514,000000 <br /> lanes <br /> Add 3rd southbound left turn lane and Draft 2010 TIF <br /> 9 foothill Road Canyon Way/Dublin Canyon Road widen eastbound Canyon Way to receive Report 5750,000 5750,000 No 100% 76% 100% 5750,000 5750000 <br /> traffic from aleft turn lanes <br /> Add a third southbound left tum lane; Draft 2010 TIF <br /> 10 Foothill Road Stoneridge Done 5400,000 5600.000 No 1 90% 100% 5400,000 5600000 <br /> consider removing split phasing Report <br /> Widen SB approach to provide 2nd left- Draft 2010 TIF 51,100000 51,11O.000 No 100% 10095 100% 51,100,000 11,100000 <br /> m lane and NB right turns Report <br /> Add 3rd southbound and eastbound left Draft 2010 TIF <br /> 12 Hacienda Drive Owens Orve tum lanes from through lanes Report 51,600,000 01,600,000 No 100% 95% 100% 51,600.000 $1,600,000 <br /> Modify northbound lanes to WN build Draft 2010 TIF <br /> 13A Hopyard Road Owens Drive(Phase II configuration:2 eft turns,3 through 1 Report No 100% 86% 100% 50 50 <br /> richt turn <br /> Modify lanes;Northbound:2 left turns,3 <br /> through 1 right turn;Southbound 3 left <br /> turns,3 through.1 right tum thee); <br /> 13B Hopyard Road Owens Drive(Full Build) Eastbound 2left[urn 21Mough 1 bight Draft 2010 III 51,500,000 51,500,000 No 100% 16% 100% 51,500000 !1,500000 <br /> turn Westbound:2left turn 2 through 1 Report <br /> right turn(free),unsplit <br /> eastbound/westbound;narrow lane to <br /> reduce pedestrian ckarence to 20 seconds <br /> Construct as 2lane street w4h 1 WLTL and Draft 2010 TIF 0,000 15,000,000 <br /> 14 Nevada Street first Street to California Avenue bike lanes $5,000000 55,000,000 No 100% 100% 100% 15,00Report <br /> 15 Santa Rita Road 1-580 Eastbound OX-Ramp/Pimlico Construct 2nd southbound left turn lane Orsft�21tD III 10 <br /> 57,700, 0 57,700,000 No 100% 91% 100% 57,100,000 97,700,000 <br /> B-1 <br />