Laserfiche WebLink
Pleasanton Development Impact Fee Nexus Study <br /> Draft Report 07/12/18 <br /> analysis. Additionally, a new police station is envisioned within a new Civic Center. The cost for <br /> the new station is included in the Civic Center estimate, as further described below. <br /> Downtown Parking <br /> This analysis assumes a new approximately 200-space parking structure in downtown. The <br /> parking will serve needs of existing and new service population and is estimated to cost $5.5 <br /> million as a planning-level estimate. <br /> Civic Center <br /> The existing City Hall building is assumed to be relocated to the Bernal Property with the existing <br /> Civic Center redeveloped for commercial uses. The new Civic Center will consist of the City Hall, <br /> library, community center, a police station, and a new 200-space parking deck. The City <br /> estimates the total cost for the new Civic Center to be around $150 million based on the input <br /> from City staff. About $14.1 million of this cost estimate covers parks and open space <br /> improvements with the cost assumed under the parks fee. <br /> Total net civic center facility improvements are projected to cost $135.9 million, as shown in <br /> Table 15. <br /> Economic& Planning Systems, Inc. 18 P:\151000s\151111PleasantonFee\Report\151111_FeeNexus_071218.docx <br />