Laserfiche WebLink
Page 2 <br /> Learning Center <br /> • Explore the use of solar panels. <br /> Sub-Area 7 General Comments <br /> • Consider all available water sources, including the City's adjacent pond, wells, gray water, <br /> etc., to minimize the need for potable water for the project. <br /> • Develop the Phase One construction plan to assure maximum development of all Sub-Area <br /> 7 infrastructure, including both parking lots, while also considering overall funding, <br /> efficiency, cost effectiveness and need. <br /> • Consider gating both parking lots to secure site during off hours. <br /> • Amend the overall Community Farm guidelines to be consistent with the City's pesticide <br /> use policies. <br /> Sub-Area 16 <br /> • Evaluate the need and benefit for including fencing along the trail. <br /> • Evaluate fire safety vehicle and equipment access to the Orchard and buffer areas. <br /> • Reevaluate the types of trees and planting plan for the buffer area adjacent to rear yards on <br /> Laguna Creek Lane to address residents' desired view preferences. <br /> SUMMARY OF COMMENTS BY INDIVIDUAL COMMISSIONERS <br /> Commissioner Wahl <br /> • Consider various sized raised garden plots, including smaller sized raised garden plots, in <br /> the Garden Patch. In general, the current sized raised garden plots are oversized and most <br /> user can get by with raised garden plots half the size. <br /> • Take steps to assure that the raised garden plots in the Garden Patch accommodate the <br /> disabled and seniors who may have problems with raised garden plots that are too close to <br /> the ground. She encourages the services of an accessibility consultant regarding this matter. <br /> • Seek cooperation with the local Boy Scouts to assist with bed construction and maintenance. <br /> • Consider a gate at the entrance of the parking lots so that the entire park can be secure <br /> during off hours. <br /> Commissioner Fields <br /> • Recommends that Phase One include construction of both Sub-Area 7 parking lots and as <br /> much infrastructure as possible and practical. <br /> • Evaluate the need for fencing Sub-Area 16 along the trail. <br /> • Conduct a fire safety evaluation plan for Sub-Area 16 to assure adequate vehicle and <br /> equipment access. <br /> • Continue to evaluate the availability of various types of water, including water from the <br /> Valley Avenue run-off pond. <br />