Laserfiche WebLink
y.r..n,4i'r <br /> wrigrafolawm <br /> The City Council awarded the construction contract on March 21, 2017. Work began in <br /> the summer of 2017 and Phase 1 of the project was completed in fall 2017. The <br /> improvements consist of constructing a protected bike lane for both eastbound Stanley <br /> Boulevard and northbound Bernal Avenue, and a protected intersection design on three of <br /> the four corners. <br /> • Status Under Review <br /> • Next Steps/Details: City Council provided direction to begin the Phase 2 <br /> design which will complete the fourth corner of the <br /> intersection. Design to begin in the 2018/19 fiscal year. <br /> Traffic Operations <br /> 58. Sunol Boulevard Transportation/Traffic Project <br /> Interchange <br /> The City was awarded the Innovative Deployments to Enhance Arterials (IDEA) <br /> Challenge Grant. This grant encourages local agencies to implement cutting edge <br /> technological solutions to help improve travel time, safety, and traffic operations <br /> reliability for all modes of transportation. The City will implement Automated Traffic <br /> Signal Performance Measures (ATSPM)technology that can measure the performance of <br /> a single signalized intersection or a corridor of signalized intersections, as well as, <br /> provide origin and destination data of vehicles. Some performance measures include, but <br /> are not limited to, travel time, travel speed, traffic volumes, and delay. The data can be <br /> measured against historical data to better understand traffic trends, efficiency, and <br /> understand travel patterns, all of which will aid staff in improving overall traffic <br /> operations. Lastly,this project will look to integrate other traffic related data, such as <br /> Waze, to achieve a comprehensive set of information between the city's traffic signals <br /> and the road user themselves. This technology will be installed at approximately 48 <br /> signalized intersections. <br /> • Status Under Review <br /> • Next Steps/Details: MTC will officially award the grant in March 2018. Upon <br /> award of the $290,000 staff will order the Miovision <br /> ATSPM product for installation in Summer 2018. <br />