Laserfiche WebLink
54. Overcrossing Improvement Transportation/Traffic Project <br /> Plan for Pedestrians and <br /> Bicycles <br /> City Council at its Sept. 13, 2016 meeting awarded the Freeway Overcrossing <br /> Improvement Plan project to BKF Engineering. This plan will include an identification of <br /> needed improvements and an implementation strategy to improve bicycle and pedestrian <br /> facilities at the freeway overcrossings. Included with project deliverables will be a set of <br /> plans for each overcrossing that will be used for future construction. The plans are <br /> expected to be completed in spring 2018, at which point the draft plan will be brought to <br /> the Pedestrian Bicycle and Trails Committee for review and comment. <br /> • Status Under Review <br /> • Next Steps/Details: Present the draft Overcrossing Improvement Plans to the <br /> Pedestrian Bicycle and Trails Committee in spring 2018. <br /> 55. Iron Horse Trail at Arroyo Transportation/Traffic Project <br /> Mocho Canal Bridge Study <br /> In 2016, the City received a $25,000 grant from the Alameda County Transportation <br /> Commission (Alameda CTC)to study the feasibility of providing a bicycle and <br /> pedestrian bridge over the Arroyo Mocho Canal at the Iron Horse Trail. Construction of a <br /> bicycle and pedestrian bridge over the Arroyo Mocho at the Iron Horse Trail would <br /> eliminate the need to cross Santa Rita Road when using the Iron Horse Trail. The study is <br /> complete. It investigated the feasibility of five different bridge locations and provided a <br /> recommended location based on cost. <br /> • Status Under Review <br /> • Next Steps/Details: Present the Iron Horse Trail at Arroyo Mocho Canal <br /> Bridge Study to the Pedestrian Bicycle and Trails <br /> Committee in March 2018 to have them select the <br /> preferred bridge location. <br /> 56. Bernal Bridge Transportation/Traffic Project <br /> Improvements <br /> This project is complete. The project removed the existing lead paint and repainted the <br /> Bernal Bridge over the Arroyo de la Laguna. The work was initiated in June 2017 and <br /> was completed in August 2017. <br /> • Status Under Construction <br /> • Next Steps/Details: Begin new project of designing second bridge to run <br /> parallel to the existing Bernal Bridge. <br /> 57. Stanley/Valley/Bernal Transportation/Traffic Project <br /> Intersection Improvements <br /> This project will provide enhanced safety features for pedestrians and bicyclists at the <br /> Stanley/Valley/Bernal signalized intersection. <br />