SECOND BERNAL BRIDGE AT ARROYO DE LA LAGUNA <br /> SCOPE OF WORK <br /> Date: December 18,2017 <br /> information, feasibility studies and reports previously prepared for this structure, and available Caltrans bridge <br /> inspection reports and as-built plans. Other project information may be obtained from the City,Alameda County <br /> Flood Control, local agencies, utilities, and other organizations. Consultant will research the historic and visual <br /> context to gain a better understanding of how the Second Bridge at Bernal would integrate with the surrounding <br /> community and physical landscape. <br /> Consultant will also perform site visits to supplement available record information and to research the surrounding <br /> neighborhood and built-out environment, as well as the existing bicycle and pedestrian facilities that connect, or <br /> may connect in the future,to the Second Bridge at Bernal Avenue and Arroyo de la Laguna project.Data collected <br /> will include photos,videos (on-the-ground and aerial by drone), and field notes, and will be incorporated into the <br /> draft Project Goals and Constraints Memorandum. <br /> Task 1.1.2—Data Research and Evaluation [BCA,BKF] <br /> Consultant will review the data obtain with Task 1.1.1 project limits,including project scope,contact information, <br /> schedule,budget,regulatory items,City and other agency approval processes,and other administrative procedures. <br /> Consultant will review any project material available from the City,Zone 7,various utility companies,Caltrans and <br /> other stakeholders.The project material will include but not limited to:as-built plans,Caltrans Maintenance reports, <br /> right-of-way maps,scour analysis studies,potential traffic detour plans,traffic count data,FEMA and Zone 7 flood <br /> maps and hydrologic data,and utility company atlas drawings which might indicate site constraints including buried <br /> and overhead utilities,etc. <br /> Consultant will review, evaluate and analyze primary data collected during the field visits, as well as existing <br /> documents pertaining to the project,for inclusion and discussion in the draft Project Goals and Constraints Report. <br /> Consultant will use a comprehensive data tracking spreadsheet to facilitate data collection efforts, as well as <br /> document and track pending information. This spreadsheet will be updated regularly and provided to the City. <br /> Task 1.1.3—Constraints and Requirements Analysis [BCA,BKF,AVILA] <br /> Consultant will meet with City to discuss and confirm project constraints and design criteria.Consultant will develop <br /> the working draft of the Project Goals and Constraints Memorandum,which will be available to the City and Project <br /> Team as a shared document to facilitate collaboration and discussion. <br /> Consultant will support the development of a Constraints and Requirements Analysis by providing information and <br /> input on likely environmental constraints and opportunities associated with the various project design alternatives <br /> under consideration. This task will include Project Manager in-person attendance at the project Kick-off Meeting <br /> and attendance at up to 12 PDT meetings during this phase. <br /> Deliverables; Task 1.1—Project Assessment <br /> ✓ Project Data <br /> ✓ Data Research and Collection Spreadsheet <br /> ✓ Draft Project Goals and Constraints Memorandum <br /> Task 1.2—Topographic Mapping/ Right-of-Way/ Utilities <br /> Task 1.2.1—Aerial Topographic Survey [BCA,BKF] <br /> Consultant will develop planimetrics from aerial mapping based on City of Pleasanton datum. <br /> Task 1.2.2—Preliminary Right-of-Way Engineering[BCA,BKF] <br /> Consultant will identify approximate (record) right-of-way needs including utilities,fee acquisitions,easements,and <br /> temporary construction easements for the feasibility study. <br /> Task 1.2.3—Project Base Map [BCA,BKF] <br /> Consultant will prepare project base map from aerial mapping to be used for the background map basis for <br /> developing the alignment and bridge layout alternative. <br /> Deliverables; Task 1.2—Topographic Mapping/Right-of-Way/Utilities: <br /> ✓ Project Base Map <br /> 2 <br />