My WebLink
|
Help
|
About
|
Sign Out
09A
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
020618
>
09A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 5:19:12 PM
Creation date
1/31/2018 3:10:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/6/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consistent with the City Council's goal and priority to support Sunflower Hill, the City Council <br />also approved an Exclusive Negotiating Rights Agreement (ENRA) between the City and <br />Sunflower Hill which established procedures, milestones and standards for the development of <br />the affordable project. The approved ENRA is attached as Exhibit D for reference. <br />The developer for Irby Ranch has also agreed to allow families of Sunflower Hill members the <br />first right to purchase homes adjacent to the Sunflower Hill development. The original applicant <br />for Irby Ranch, Mike Serpa, has now partnered with Meritage Homes and has sold the majority <br />interest of the development to them. Meritage Homes has named the project "The Homestead <br />at Irby Ranch" and is now moving forward with the project. For consistency, the private <br />residential project will be referred to as "Irby Ranch" in this report. Plans have been submitted <br />to the City which are currently under review and Meritage Homes anticipates beginning site <br />demolition in November and preliminary grading as weather permits through winter. On <br />September 5, 2017, Sunflower Hill submitted the subject application for a PUD development <br />plan to construct the affordable multi -family residential community. <br />AREA AND SITE DESCRIPTION <br />The Irby Ranch development consists of the Irby, Kaplan, and Zia properties located at <br />3780 and 3878 Stanley Boulevard and 3988 First Street. The properties were developed in the <br />late 1800's and early 1900's with single-family homes, including barns and agricultural <br />buildings. Altogether, the three properties total approximately 15 acres of land. The properties <br />also include a 2.7 -acre portion of Arroyo Del Valle and adjacent open space generally running <br />west to east along the southern property line. The site of the Sunflower Hill project comprises <br />approximately 1.64 acres located along the southeast corner of the Irby property (3780 Stanley <br />Boulevard), fronting the future Nevada Street extension. <br />Surrounding Uses <br />The subject site would be located at the southeast corner of Irby Ranch, fronting onto the <br />future Nevada Street extension with land planned for new single-family homes to the north and <br />west, a self -storage facility (Public Storage) directly to the east, and the future Nevada Street <br />extension and arroyo to the south. Figure 2 shows a vicinity map of Irby Ranch, the subject site <br />and surrounding area. <br />PUD -129, 3780 Stanley Blvd. Planning Commission <br />3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.